Hello all,
I am dealing with Bill of Materials in Manufacturing. While creating bill of materials for a product, is there any way to set component product quantity to batch of a product? Let me explain: I have a recipe to prepare a batch of item "ABC" which is a food item, measured in WT_kg, e.g 5 Kg of item "ABC". So, I have quantities of components for batch(5 Kg) of item "ABC" and not for 1 Kg. What I am doing is, dividing quantities of components by batch size(5 Kg) & creating bill of materials . After this I create a production run for item "ABC" with quantity as 5 Kg. It is very time consuming process for me as I have big count of recipes. Is there any way to reduce my efforts? -- Regards, Nikhil Bonte. vnnogile Solutions Private Limited |
Hi Nikhil,
Customisation is required in order to support process manufacturing. Basically, you will need to have a new entity/table to store the batch quantity for a BOM, and work through the manufacturing process to fit the requirements. Regards, James
|
In reply to this post by Nikhil Bonte
Hi Nikhil,
I think the BoM configuration could be created based on standard ratio for each component you generally follow for preparing the item 'ABC' irrespective of batch size. Instead the batch size could be dynamic and always set over Production run under 'Qty to Produce' where it would project the component level requirement using BoM configuration. For your example, say as per your standard recipe if we set BoM such that 1Kg of ABC requires 0.6Kg of X , 0.2Kg of Y, 0.2 Kg of Z. Then you can create production run for preparing 5Kg (or whatever different batch size) of ABC and above set BoM configuration would be used to project the actual component requirements i.e. 3Kgs of X, 1 Kg of Y and 1 Kg of Z in this case to complete the batch production. Thanks!! Regards, Ratnesh Upadhyay HotWax Systems | www.hotwaxsystems.com On Wed, Nov 9, 2016 at 6:34 PM, Nikhil Bonte <[hidden email]> wrote: > Hello all, > > I am dealing with Bill of Materials in Manufacturing. > > While creating bill of materials for a product, is there any way to set > component product quantity to batch of a product? > > Let me explain: > I have a recipe to prepare a batch of item "ABC" which is a food item, > measured in WT_kg, e.g 5 Kg of item "ABC". > So, I have quantities of components for batch(5 Kg) of item "ABC" and not > for 1 Kg. > What I am doing is, dividing quantities of components by batch size(5 Kg) > & creating bill of materials . After this I create a production run for > item "ABC" with quantity as 5 Kg. > > It is very time consuming process for me as I have big count of recipes. > Is there any way to reduce my efforts? > > -- > Regards, > Nikhil Bonte. > vnnogile Solutions Private Limited > > -- -- ---------------------------------------------------- Cheers, Thanks and Regards, Ratnesh Upadhyay Senior Business Analyst (Enterprise Software Solutions) HotWax Media, Inc. http://www.hotwaxmedia.com ---------------------------------------------------- E-mail : [hidden email] Mobile : +919826886909 |
Free forum by Nabble | Edit this page |