Hi all,
what relationship exists between field "Role Type Id" found in form "Project > Resources > Add a Resource" and fields "Role Type" and "Type" found in form "Party > Parties"? How is it possible to add new items to the "Role Type Id" list? Many thanks in advance for your help, Armando |
Hi,
the roletype is exactly the same however only a limited number are used in the project manager. You can add new values in the party manager or go to webtools where you can add records in the RoleType entity. Regards, Hans -- Ofbiz on twitter: http://twitter.com/apache_ofbiz Myself on twitter: http://twitter.com/hansbak Antwebsystems.com: Quality services for competitive rates. On Thu, 2010-03-11 at 11:43 +0100, Bertuzzi, Armando [Nervianoms] wrote: > Hi all, > what relationship exists between field "Role Type Id" found in form > "Project > Resources > Add a Resource" and fields "Role Type" and "Type" > found in form "Party > Parties"? > How is it possible to add new items to the "Role Type Id" list? > Many thanks in advance for your help, > Armando |
Hans,
thank you for your prompt answer. Following your tips I was able to add the necessary items to the "Role Type Id" list. Best regards, Armando -----Original Message----- From: Hans Bakker [mailto:[hidden email]] Sent: Thursday, March 11, 2010 11:55 AM To: [hidden email] Subject: Re: Edit "Role Type Id" list Hi, the roletype is exactly the same however only a limited number are used in the project manager. You can add new values in the party manager or go to webtools where you can add records in the RoleType entity. Regards, Hans -- Ofbiz on twitter: http://twitter.com/apache_ofbiz Myself on twitter: http://twitter.com/hansbak Antwebsystems.com: Quality services for competitive rates. On Thu, 2010-03-11 at 11:43 +0100, Bertuzzi, Armando [Nervianoms] wrote: > Hi all, > what relationship exists between field "Role Type Id" found in form > "Project > Resources > Add a Resource" and fields "Role Type" and "Type" > found in form "Party > Parties"? > How is it possible to add new items to the "Role Type Id" list? > Many thanks in advance for your help, > Armando |
Hi all,
I have difficulties in locating the html reports that are part of the ProjectMgr component. Reports of this component should include - Task Reports, - Task by priority, - Task over time estimate or past schedule - Estimated schedule/workload for party X etc. Can someone direct me to where they can be found? Many thanks in advance for your help, Armando |
Hi Amando.
Reporting of the project manager is currently limited to the projectoverview. I am developing a more extensive project manager which will be available later this year. Regards, Hans On Tue, 2010-03-16 at 14:30 +0100, Bertuzzi, Armando [Nervianoms] wrote: > Hi all, > I have difficulties in locating the html reports that are part of the > ProjectMgr component. > Reports of this component should include > - Task Reports, > - Task by priority, > - Task over time estimate or past schedule > - Estimated schedule/workload for party X > etc. > Can someone direct me to where they can be found? > Many thanks in advance for your help, > Armando > > Ofbiz on twitter: http://twitter.com/apache_ofbiz Myself on twitter: http://twitter.com/hansbak Antwebsystems.com: Quality services for competitive rates. |
I understand.
From what menu/level can the projectoverview report be launched? Armando -----Original Message----- From: Hans Bakker [mailto:[hidden email]] Sent: Tuesday, March 16, 2010 2:39 PM To: [hidden email] Subject: Re: Reports of ProjectMgr component Hi Amando. Reporting of the project manager is currently limited to the projectoverview. I am developing a more extensive project manager which will be available later this year. Regards, Hans On Tue, 2010-03-16 at 14:30 +0100, Bertuzzi, Armando [Nervianoms] wrote: > Hi all, > I have difficulties in locating the html reports that are part of the > ProjectMgr component. > Reports of this component should include > - Task Reports, > - Task by priority, > - Task over time estimate or past schedule > - Estimated schedule/workload for party X etc. > Can someone direct me to where they can be found? > Many thanks in advance for your help, > Armando > > Ofbiz on twitter: http://twitter.com/apache_ofbiz Myself on twitter: http://twitter.com/hansbak Antwebsystems.com: Quality services for competitive rates. |
project -> select a project
On Tue, 2010-03-16 at 15:02 +0100, Bertuzzi, Armando [Nervianoms] wrote: > I understand. > >From what menu/level can the projectoverview report be launched? > Armando > > -----Original Message----- > From: Hans Bakker [mailto:[hidden email]] > Sent: Tuesday, March 16, 2010 2:39 PM > To: [hidden email] > Subject: Re: Reports of ProjectMgr component > > Hi Amando. > > Reporting of the project manager is currently limited to the > projectoverview. > > I am developing a more extensive project manager which will be available > later this year. > > Regards, > Hans > > > On Tue, 2010-03-16 at 14:30 +0100, Bertuzzi, Armando [Nervianoms] wrote: > > Hi all, > > I have difficulties in locating the html reports that are part of the > > ProjectMgr component. > > Reports of this component should include > > - Task Reports, > > - Task by priority, > > - Task over time estimate or past schedule > > - Estimated schedule/workload for party X etc. > > Can someone direct me to where they can be found? > > Many thanks in advance for your help, > > Armando > > > > > -- > Ofbiz on twitter: http://twitter.com/apache_ofbiz Myself on twitter: > http://twitter.com/hansbak > Antwebsystems.com: Quality services for competitive rates. > Ofbiz on twitter: http://twitter.com/apache_ofbiz Myself on twitter: http://twitter.com/hansbak Antwebsystems.com: Quality services for competitive rates. |
Hans, thank you very much for your answer.
Just for for the sake of clarity: the projectoverview report is the collection of information presented on the screen when a project is selected (sub-item "Project Summary"). Am I correct? Armando -----Original Message----- From: Hans Bakker [mailto:[hidden email]] Sent: Tuesday, March 16, 2010 3:25 PM To: [hidden email] Subject: RE: Reports of ProjectMgr component project -> select a project On Tue, 2010-03-16 at 15:02 +0100, Bertuzzi, Armando [Nervianoms] wrote: > I understand. > >From what menu/level can the projectoverview report be launched? > Armando > > -----Original Message----- > From: Hans Bakker [mailto:[hidden email]] > Sent: Tuesday, March 16, 2010 2:39 PM > To: [hidden email] > Subject: Re: Reports of ProjectMgr component > > Hi Amando. > > Reporting of the project manager is currently limited to the > projectoverview. > > I am developing a more extensive project manager which will be > available later this year. > > Regards, > Hans > > > On Tue, 2010-03-16 at 14:30 +0100, Bertuzzi, Armando [Nervianoms] > > Hi all, > > I have difficulties in locating the html reports that are part of > > the ProjectMgr component. > > Reports of this component should include > > - Task Reports, > > - Task by priority, > > - Task over time estimate or past schedule > > - Estimated schedule/workload for party X etc. > > Can someone direct me to where they can be found? > > Many thanks in advance for your help, Armando > > > > > -- > Ofbiz on twitter: http://twitter.com/apache_ofbiz Myself on twitter: > http://twitter.com/hansbak > Antwebsystems.com: Quality services for competitive rates. > Ofbiz on twitter: http://twitter.com/apache_ofbiz Myself on twitter: http://twitter.com/hansbak Antwebsystems.com: Quality services for competitive rates. |
sure!
On Tue, 2010-03-16 at 15:44 +0100, Bertuzzi, Armando [Nervianoms] wrote: > Hans, thank you very much for your answer. > Just for for the sake of clarity: the projectoverview report is the > collection of information presented on the screen when a project is > selected (sub-item "Project Summary"). > Am I correct? > Armando > > > > -----Original Message----- > From: Hans Bakker [mailto:[hidden email]] > Sent: Tuesday, March 16, 2010 3:25 PM > To: [hidden email] > Subject: RE: Reports of ProjectMgr component > > project -> select a project > > On Tue, 2010-03-16 at 15:02 +0100, Bertuzzi, Armando [Nervianoms] wrote: > > I understand. > > >From what menu/level can the projectoverview report be launched? > > Armando > > > > -----Original Message----- > > From: Hans Bakker [mailto:[hidden email]] > > Sent: Tuesday, March 16, 2010 2:39 PM > > To: [hidden email] > > Subject: Re: Reports of ProjectMgr component > > > > Hi Amando. > > > > Reporting of the project manager is currently limited to the > > projectoverview. > > > > I am developing a more extensive project manager which will be > > available later this year. > > > > Regards, > > Hans > > > > > > On Tue, 2010-03-16 at 14:30 +0100, Bertuzzi, Armando [Nervianoms] > wrote: > > > Hi all, > > > I have difficulties in locating the html reports that are part of > > > the ProjectMgr component. > > > Reports of this component should include > > > - Task Reports, > > > - Task by priority, > > > - Task over time estimate or past schedule > > > - Estimated schedule/workload for party X etc. > > > Can someone direct me to where they can be found? > > > Many thanks in advance for your help, Armando > > > > > > > > -- > > Ofbiz on twitter: http://twitter.com/apache_ofbiz Myself on twitter: > > http://twitter.com/hansbak > > Antwebsystems.com: Quality services for competitive rates. > > > -- > Ofbiz on twitter: http://twitter.com/apache_ofbiz Myself on twitter: > http://twitter.com/hansbak > Antwebsystems.com: Quality services for competitive rates. > Ofbiz on twitter: http://twitter.com/apache_ofbiz Myself on twitter: http://twitter.com/hansbak Antwebsystems.com: Quality services for competitive rates. |
Hans,
thanks again for your time. Best regards, Armando -----Original Message----- From: Hans Bakker [mailto:[hidden email]] Sent: Tuesday, March 16, 2010 4:03 PM To: [hidden email] Subject: RE: Reports of ProjectMgr component sure! On Tue, 2010-03-16 at 15:44 +0100, Bertuzzi, Armando [Nervianoms] wrote: > Hans, thank you very much for your answer. > Just for for the sake of clarity: the projectoverview report is the > collection of information presented on the screen when a project is > selected (sub-item "Project Summary"). > Am I correct? > Armando > > > > -----Original Message----- > From: Hans Bakker [mailto:[hidden email]] > Sent: Tuesday, March 16, 2010 3:25 PM > To: [hidden email] > Subject: RE: Reports of ProjectMgr component > > project -> select a project > > On Tue, 2010-03-16 at 15:02 +0100, Bertuzzi, Armando [Nervianoms] > > I understand. > > >From what menu/level can the projectoverview report be launched? > > Armando > > > > -----Original Message----- > > From: Hans Bakker [mailto:[hidden email]] > > Sent: Tuesday, March 16, 2010 2:39 PM > > To: [hidden email] > > Subject: Re: Reports of ProjectMgr component > > > > Hi Amando. > > > > Reporting of the project manager is currently limited to the > > projectoverview. > > > > I am developing a more extensive project manager which will be > > available later this year. > > > > Regards, > > Hans > > > > > > On Tue, 2010-03-16 at 14:30 +0100, Bertuzzi, Armando [Nervianoms] > wrote: > > > Hi all, > > > I have difficulties in locating the html reports that are part of > > > the ProjectMgr component. > > > Reports of this component should include > > > - Task Reports, > > > - Task by priority, > > > - Task over time estimate or past schedule > > > - Estimated schedule/workload for party X etc. > > > Can someone direct me to where they can be found? > > > Many thanks in advance for your help, Armando > > > > > > > > -- > > Ofbiz on twitter: http://twitter.com/apache_ofbiz Myself on twitter: > > http://twitter.com/hansbak > > Antwebsystems.com: Quality services for competitive rates. > > > -- > Ofbiz on twitter: http://twitter.com/apache_ofbiz Myself on twitter: > http://twitter.com/hansbak > Antwebsystems.com: Quality services for competitive rates. > Ofbiz on twitter: http://twitter.com/apache_ofbiz Myself on twitter: http://twitter.com/hansbak Antwebsystems.com: Quality services for competitive rates. |
In reply to this post by hans_bakker
Le 16/03/2010 14:38, Hans Bakker a écrit :
> Hi Amando. > > Reporting of the project manager is currently limited to the > projectoverview. > > I am developing a more extensive project manager which will be available > later this year. > > Regards, > Hans Hi Hans, what are the next functionnalities you will be introducing ? Will you create a new module, or will this be integrated to the actual projectmgr ? And last question, when is later ? Thanks, -- Erwan de FERRIERES www.nereide.biz |
hi Erwan,
I just put the new component in production at our company system. I called it 'custserv' for customer service and is an extension of the project manager. This new component handles everything around the customer request and when work is required by an employee, can open a related task. functions currently included: (from the docbook document: - Customer Request (ticket) with several status values to track progess - Incoming Email (or telephone call not yet) are stored as a communicationEvent - Automatic creation of a customer request from a communication event - Possibility to add attachments to communication events and customer requests - Separate stored communication events related to a customer request - Incoming email will automatically relate to the customer request again via a #CR code in the subject line. - Assignment of a customer request to a project task and in turn to a person who can register time which can be invoiced automatically - Satus screen showing open/inprocess and draft customer requests - Incoming email and customer requests can be handled by separate employees. - List all communication events for a customer or a specific request. - Extensive search function within communication events and customer requests With this component, programmers do not need an company email and still can communicate with the customer. Regards, Hans On Mon, 2010-03-22 at 10:31 +0100, Erwan de FERRIERES wrote: > Le 16/03/2010 14:38, Hans Bakker a écrit : > > Hi Amando. > > > > Reporting of the project manager is currently limited to the > > projectoverview. > > > > I am developing a more extensive project manager which will be available > > later this year. > > > > Regards, > > Hans > > Hi Hans, > > what are the next functionnalities you will be introducing ? > Will you create a new module, or will this be integrated to the actual > projectmgr ? > And last question, when is later ? > > Thanks, > Ofbiz on twitter: http://twitter.com/apache_ofbiz Myself on twitter: http://twitter.com/hansbak Antwebsystems.com: Quality services for competitive rates. |
Seems interesting Hans - wished it had been in OFBiz, but much like the OpenTaps stuff that is not licensed under apache and none of us can technically work on - please have your discussions off list about your new components that you are building outside of OFBiz.
Cheers, Ruppert On Mar 22, 2010, at 8:49 AM, Hans Bakker wrote: > hi Erwan, > > I just put the new component in production at our company system. > > I called it 'custserv' for customer service and is an extension of the > project manager. > > This new component handles everything around the customer request and > when work is required by an employee, can open a related task. > > functions currently included: (from the docbook document: > - Customer Request (ticket) with several status values to track progess > - Incoming Email (or telephone call not yet) are stored as a > communicationEvent > - Automatic creation of a customer request from a communication event > - Possibility to add attachments to communication events and customer > requests > - Separate stored communication events related to a customer request > - Incoming email will automatically relate to the customer request again > via a #CR code in the subject line. > - Assignment of a customer request to a project task and in turn to a > person who can register time which can be invoiced automatically > - Satus screen showing open/inprocess and draft customer requests > - Incoming email and customer requests can be handled by separate > employees. > - List all communication events for a customer or a specific request. > - Extensive search function within communication events and customer > requests > > With this component, programmers do not need an company email and still > can communicate with the customer. > > Regards, > Hans > > > > On Mon, 2010-03-22 at 10:31 +0100, Erwan de FERRIERES wrote: >> Le 16/03/2010 14:38, Hans Bakker a écrit : >>> Hi Amando. >>> >>> Reporting of the project manager is currently limited to the >>> projectoverview. >>> >>> I am developing a more extensive project manager which will be available >>> later this year. >>> >>> Regards, >>> Hans >> >> Hi Hans, >> >> what are the next functionnalities you will be introducing ? >> Will you create a new module, or will this be integrated to the actual >> projectmgr ? >> And last question, when is later ? >> >> Thanks, >> > -- > Ofbiz on twitter: http://twitter.com/apache_ofbiz > Myself on twitter: http://twitter.com/hansbak > Antwebsystems.com: Quality services for competitive rates. > |
Tim,
It is always 'nice' to see you are keeping people together here. this was just answering a question from Erwan and now you are giving me even more reason to bring out components outside of ofbiz. have a nice day. Regards, Hans On Mon, 2010-03-22 at 08:52 -0600, Tim Ruppert wrote: > Seems interesting Hans - wished it had been in OFBiz, but much like the OpenTaps stuff that is not licensed under apache and none of us can technically work on - please have your discussions off list about your new components that you are building outside of OFBiz. > > Cheers, > Ruppert > > On Mar 22, 2010, at 8:49 AM, Hans Bakker wrote: > > > hi Erwan, > > > > I just put the new component in production at our company system. > > > > I called it 'custserv' for customer service and is an extension of the > > project manager. > > > > This new component handles everything around the customer request and > > when work is required by an employee, can open a related task. > > > > functions currently included: (from the docbook document: > > - Customer Request (ticket) with several status values to track progess > > - Incoming Email (or telephone call not yet) are stored as a > > communicationEvent > > - Automatic creation of a customer request from a communication event > > - Possibility to add attachments to communication events and customer > > requests > > - Separate stored communication events related to a customer request > > - Incoming email will automatically relate to the customer request again > > via a #CR code in the subject line. > > - Assignment of a customer request to a project task and in turn to a > > person who can register time which can be invoiced automatically > > - Satus screen showing open/inprocess and draft customer requests > > - Incoming email and customer requests can be handled by separate > > employees. > > - List all communication events for a customer or a specific request. > > - Extensive search function within communication events and customer > > requests > > > > With this component, programmers do not need an company email and still > > can communicate with the customer. > > > > Regards, > > Hans > > > > > > > > On Mon, 2010-03-22 at 10:31 +0100, Erwan de FERRIERES wrote: > >> Le 16/03/2010 14:38, Hans Bakker a écrit : > >>> Hi Amando. > >>> > >>> Reporting of the project manager is currently limited to the > >>> projectoverview. > >>> > >>> I am developing a more extensive project manager which will be available > >>> later this year. > >>> > >>> Regards, > >>> Hans > >> > >> Hi Hans, > >> > >> what are the next functionnalities you will be introducing ? > >> Will you create a new module, or will this be integrated to the actual > >> projectmgr ? > >> And last question, when is later ? > >> > >> Thanks, > >> > > -- > > Ofbiz on twitter: http://twitter.com/apache_ofbiz > > Myself on twitter: http://twitter.com/hansbak > > Antwebsystems.com: Quality services for competitive rates. > > > Ofbiz on twitter: http://twitter.com/apache_ofbiz Myself on twitter: http://twitter.com/hansbak Antwebsystems.com: Quality services for competitive rates. |
Since I didn't have a chance to get my - wow I hope that Hans doesn't feel attacked ... again ... message - to clarify, here is more information that I wish I'd have put in there so that people don't get so touchy:
1. Man Hans, wish you were still working on OFBiz more often - sorry to see you put this outside of OFBiz. 2. Could you please provide us with some URLs where we can send requests about your customer service app that you're providing so that people don't get confused that this comes with OFBiz. Oh, and Hans, have a nice day :) Cheers, Ruppert On Mar 22, 2010, at 8:57 AM, Hans Bakker wrote: > Tim, > It is always 'nice' to see you are keeping people together here. > this was just answering a question from Erwan and now you are giving me > even more reason to bring out components outside of ofbiz. > > have a nice day. > > Regards, > Hans > > On Mon, 2010-03-22 at 08:52 -0600, Tim Ruppert wrote: >> Seems interesting Hans - wished it had been in OFBiz, but much like the OpenTaps stuff that is not licensed under apache and none of us can technically work on - please have your discussions off list about your new components that you are building outside of OFBiz. >> >> Cheers, >> Ruppert >> >> On Mar 22, 2010, at 8:49 AM, Hans Bakker wrote: >> >>> hi Erwan, >>> >>> I just put the new component in production at our company system. >>> >>> I called it 'custserv' for customer service and is an extension of the >>> project manager. >>> >>> This new component handles everything around the customer request and >>> when work is required by an employee, can open a related task. >>> >>> functions currently included: (from the docbook document: >>> - Customer Request (ticket) with several status values to track progess >>> - Incoming Email (or telephone call not yet) are stored as a >>> communicationEvent >>> - Automatic creation of a customer request from a communication event >>> - Possibility to add attachments to communication events and customer >>> requests >>> - Separate stored communication events related to a customer request >>> - Incoming email will automatically relate to the customer request again >>> via a #CR code in the subject line. >>> - Assignment of a customer request to a project task and in turn to a >>> person who can register time which can be invoiced automatically >>> - Satus screen showing open/inprocess and draft customer requests >>> - Incoming email and customer requests can be handled by separate >>> employees. >>> - List all communication events for a customer or a specific request. >>> - Extensive search function within communication events and customer >>> requests >>> >>> With this component, programmers do not need an company email and still >>> can communicate with the customer. >>> >>> Regards, >>> Hans >>> >>> >>> >>> On Mon, 2010-03-22 at 10:31 +0100, Erwan de FERRIERES wrote: >>>> Le 16/03/2010 14:38, Hans Bakker a écrit : >>>>> Hi Amando. >>>>> >>>>> Reporting of the project manager is currently limited to the >>>>> projectoverview. >>>>> >>>>> I am developing a more extensive project manager which will be available >>>>> later this year. >>>>> >>>>> Regards, >>>>> Hans >>>> >>>> Hi Hans, >>>> >>>> what are the next functionnalities you will be introducing ? >>>> Will you create a new module, or will this be integrated to the actual >>>> projectmgr ? >>>> And last question, when is later ? >>>> >>>> Thanks, >>>> >>> -- >>> Ofbiz on twitter: http://twitter.com/apache_ofbiz >>> Myself on twitter: http://twitter.com/hansbak >>> Antwebsystems.com: Quality services for competitive rates. >>> >> > -- > Ofbiz on twitter: http://twitter.com/apache_ofbiz > Myself on twitter: http://twitter.com/hansbak > Antwebsystems.com: Quality services for competitive rates. > |
In reply to this post by Bertuzzi, Armando [Nervianoms]
Hi all,
using the ofBiz Project Manager module I received the following error message as result of the execution of the "Schedule" command (option found in the Project Summary page). Can someone suggest how to fix the problem? "org.ofbiz.widget.screen.ScreenRenderException: Error rendering screen [component://projectmgr/widget/CommonScreens.xml#CommonProjectDecorator] : org.ofbiz.entity.transaction.GenericTransactionException: The current transaction is marked for rollback, not beginning a new transaction and aborting current operation; the rollbackOnly was caused by: Failure in findByCondition operation for entity [WorkEffort]: org.ofbiz.entity.GenericEntityException: Error getting the next result (A lock could not be obtained within the time requested). Rolling back transaction.org.ofbiz.entity.GenericEntityException: Error getting the next result (A lock could not be obtained within the time requested) (Error getting the next result (A lock could not be obtained within the time requested)) (The current transaction is marked for rollback, not beginning a new transaction and aborting current operation; the rollbackOnly was caused by: Failure in findByCondition operation for entity [WorkEffort]: org.ofbiz.entity.GenericEntityException: Error getting the next result (A lock could not be obtained within the time requested). Rolling back transaction.org.ofbiz.entity.GenericEntityException: Error getting the next result (A lock could not be obtained within the time requested) (Error getting the next result (A lock could not be obtained within the time requested)))" The program was successfully executed in a previous run, but began ending with the above error after I made some changes in the data. Even correcting those items to previous values the error continues to occur and prevents further login (*) unless the system is restarted. Many thanks in advance for your help, Armando (*) "org.ofbiz.widget.screen.ScreenRenderException: Error rendering screen [component://common/widget/CommonScreens.xml#GlobalDecorator]: java.lang.IllegalArgumentException: Error running Groovy script at location [component://projectmgr/webapp/projectmgr/WEB-INF/actions/ListCurrentPro jects.groovy]: org.ofbiz.entity.transaction.GenericTransactionException: The current transaction is marked for rollback, not beginning a new transaction and aborting current operation; the rollbackOnly was caused by: Failure in findByCondition operation for entity [WorkEffort]: org.ofbiz.entity.GenericEntityException: Error getting the next result (A lock could not be obtained within the time requested). Rolling back transaction.org.ofbiz.entity.GenericEntityException: Error getting the next result (A lock could not be obtained within the time requested) (Error getting the next result (A lock could not be obtained within the time requested)) (Error running Groovy script at location [component://projectmgr/webapp/projectmgr/WEB-INF/actions/ListCurrentPro jects.groovy]: org.ofbiz.entity.transaction.GenericTransactionException: The current transaction is marked for rollback, not beginning a new transaction and aborting current operation; the rollbackOnly was caused by: Failure in findByCondition operation for entity [WorkEffort]: org.ofbiz.entity.GenericEntityException: Error getting the next result (A lock could not be obtained within the time requested). Rolling back transaction.org.ofbiz.entity.GenericEntityException: Error getting the next result (A lock could not be obtained within the time requested) (Error getting the next result (A lock could not be obtained within the time requested)))" |
Hi all,
using the ofBiz Project Manager module, is there a way to have the "Schedule" command to schedule project tasks starting from a day different from today's date? Many thanks in advance for your help, Armando |