Manufacturing Bill of Materials substitute?

Previous Topic Next Topic
 
classic Classic list List threaded Threaded
2 messages Options
Reply | Threaded
Open this post in threaded view
|

Manufacturing Bill of Materials substitute?

cruiz
Hi everyone!

I want to manufacture a rope.

I have two Manufacturing BOM for a rope (e.g. MatA and MatB) and a substitute product for MatA which is MatASub.

Here's the question. When I manufacture the rope and MatA is out-of-stock how can i substitute MatASub?

-miL
Reply | Threaded
Open this post in threaded view
|

Re: Manufacturing Bill of Materials substitute?

Jacopo Cappellato-3
You can manually edit the components after the production run is  
created and before it is approved.

Jacopo


On Jul 17, 2008, at 4:02 AM, cruiz wrote:

>
> Hi everyone!
>
> I want to manufacture a rope.
>
> I have two Manufacturing BOM for a rope (e.g. MatA and MatB) and a
> substitute product for MatA which is MatASub.
>
> Here's the question. When I manufacture the rope and MatA is out-of-
> stock
> how can i substitute MatASub?
>
> -miL
> --
> View this message in context: http://www.nabble.com/Manufacturing-Bill-of-Materials-substitute--tp18500148p18500148.html
> Sent from the OFBiz - User mailing list archive at Nabble.com.
>