Hi,
My question is in the module of Manufacturing
I already create a Production Run(JobShop), based in Bill Of Materials and
Routing Task,
I have no problems with the materials and with the time estimated in the
task
My problem is in the Routing Task, I cannot find the way to associated the
cost with the task, my problems is to charge de cost of the resourse(like
Machine or labour) to the Father Product.
I tried with Fixed Asset that is the option that display in the Routing
Task. But it dosent charged that cost to the father product
Miguel Castellanos
Consultor TI | Sinergium S.A.C |www.sinergium.net |
<mailto:
[hidden email]>
[hidden email]