RV: Manufacturing COST of rounting Task

Miguel Castellanos

Hi,

I was reviewing the demo version, and i noticed that it has the association, the task with the cost,(that I was looking for in my last mail), but now I have this message error.

I suppose it has in testing yet, or something I configure wrong?

 

De: Miguel Castellanos [mailto:[hidden email]]
Enviado el: Jueves, 10 de Diciembre de 2009 04:23 p.m.
Para: '[hidden email]'
Asunto: Manufacturing COST of rounting Task

 

Hi,

My question is in the module of Manufacturing

 

I already create a Production Run(JobShop), based in Bill Of Materials and Routing Task,

I have no problems with the materials and with the time estimated in the task

My problem is in the Routing Task, I cannot find the way to associated the cost with the task,  my problems is to charge de cost of the resourse(like Machine or labour) to the Father Product.

I tried with Fixed Asset that is the option that display in the Routing Task. But it dosent charged that cost to the father product

 

 

Miguel Castellanos

Consultor TI | Sinergium S.A.C |www.sinergium.net | [hidden email]