Hi,
I was reviewing the
demo version, and i noticed that it has the association, the task with the
cost,(that I was looking for in my last mail), but now I have this message
error.
I suppose it has in
testing yet, or something I configure wrong?
De: Miguel
Castellanos [mailto:[hidden email]]
Enviado el: Jueves, 10 de Diciembre de 2009 04:23 p.m.
Para: '[hidden email]'
Asunto: Manufacturing COST of rounting Task
Hi,
My question is in the module of
Manufacturing
I already create a Production Run(JobShop),
based in Bill Of Materials and Routing Task,
I have no problems with the materials and
with the time estimated in the task
My problem is in the Routing Task, I cannot
find the way to associated the cost with the task, my problems is to
charge de cost of the resourse(like Machine or labour) to the Father Product.
I tried with Fixed Asset that is the option
that display in the Routing Task. But it dosent charged that cost to the father
product