RV: Manufacturing COST of rounting Task

Miguel Castellanos
It doesnt show my attach.

The error message its when I creat the production run.

The Following error occurred:

No production run is required for product id [PADRE] in date
[2009-12-04:06:21:0], please verify the validity dates

Of the bill of materials and routing.

 

De: Miguel Castellanos [mailto:[hidden email]]
Enviado el: Lunes, 14 de Diciembre de 2009 04:33 p.m.
Para: '[hidden email]'
Asunto: RV: Manufacturing COST of rounting Task

 

Hi,

I was reviewing the demo version, and i noticed that it has the association,
the task with the cost,(that I was looking for in my last mail), but now I
have this message error.

I suppose it has in testing yet, or something I configure wrong?

 

De: Miguel Castellanos [mailto:[hidden email]]
Enviado el: Jueves, 10 de Diciembre de 2009 04:23 p.m.
Para: '[hidden email]'
Asunto: Manufacturing COST of rounting Task

 

Hi,

My question is in the module of Manufacturing

 

I already create a Production Run(JobShop), based in Bill Of Materials and
Routing Task,

I have no problems with the materials and with the time estimated in the
task

My problem is in the Routing Task, I cannot find the way to associated the
cost with the task,  my problems is to charge de cost of the resourse(like
Machine or labour) to the Father Product.

I tried with Fixed Asset that is the option that display in the Routing
Task. But it dosent charged that cost to the father product

 

 

Miguel Castellanos

Consultor TI | Sinergium S.A.C |www.sinergium.net |
[hidden email] <mailto:[hidden email]>

 

Reply | Threaded
Open this post in threaded view
|

Re: RV: Manufacturing COST of rounting Task

Jacopo Cappellato-4
Please verify if the fromDate of the ProductAssoc records that represent the components of PADRE are before the date 2009-12-04:06:21:0

Jacopo

On Dec 14, 2009, at 10:55 PM, Miguel Castellanos wrote:

> It doesnt show my attach.
>
> The error message its when I creat the production run.
>
> The Following error occurred:
>
> No production run is required for product id [PADRE] in date
> [2009-12-04:06:21:0], please verify the validity dates
>
> Of the bill of materials and routing.
>
>
>
> De: Miguel Castellanos [mailto:[hidden email]]
> Enviado el: Lunes, 14 de Diciembre de 2009 04:33 p.m.
> Para: '[hidden email]'
> Asunto: RV: Manufacturing COST of rounting Task
>
>
>
> Hi,
>
> I was reviewing the demo version, and i noticed that it has the association,
> the task with the cost,(that I was looking for in my last mail), but now I
> have this message error.
>
> I suppose it has in testing yet, or something I configure wrong?
>
>
>
> De: Miguel Castellanos [mailto:[hidden email]]
> Enviado el: Jueves, 10 de Diciembre de 2009 04:23 p.m.
> Para: '[hidden email]'
> Asunto: Manufacturing COST of rounting Task
>
>
>
> Hi,
>
> My question is in the module of Manufacturing
>
>
>
> I already create a Production Run(JobShop), based in Bill Of Materials and
> Routing Task,
>
> I have no problems with the materials and with the time estimated in the
> task
>
> My problem is in the Routing Task, I cannot find the way to associated the
> cost with the task,  my problems is to charge de cost of the resourse(like
> Machine or labour) to the Father Product.
>
> I tried with Fixed Asset that is the option that display in the Routing
> Task. But it dosent charged that cost to the father product
>
>
>
>
>
> Miguel Castellanos
>
> Consultor TI | Sinergium S.A.C |www.sinergium.net |
> [hidden email] <mailto:[hidden email]>
>
>
>