Hello everyone
Now I'm confused with the manufacturing module,
I want to know whether I can start a production run ,
and issue the available materiasl only.
For example,product: product01(finished good),
product0101(raw material),two product0101 can be
used to produce one product01,now I want to produce
20 product01,so 40 product0101 is needed, but in the
warehouse there is only 35 product0101, before the
purchase shipment is arrived, I want to start the
production run (which is created by MRP) using the
available materials.How should I do, can anyone help me?
thanks and regards.
Jane.
|