[jira] [Assigned] (OFBIZ-6197) Allow production runs to be generated based on OrderItemShipGroupAssoc instead of only Shipment

Previous Topic Next Topic
 
classic Classic list List threaded Threaded
1 message Options
Reply | Threaded
Open this post in threaded view
|

[jira] [Assigned] (OFBIZ-6197) Allow production runs to be generated based on OrderItemShipGroupAssoc instead of only Shipment

Nicolas Malin (Jira)

     [ https://issues.apache.org/jira/browse/OFBIZ-6197?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Pierre Smits reassigned OFBIZ-6197:
-----------------------------------

    Assignee: Pierre Smits

> Allow production runs to be generated based on OrderItemShipGroupAssoc instead of only Shipment
> -----------------------------------------------------------------------------------------------
>
>                 Key: OFBIZ-6197
>                 URL: https://issues.apache.org/jira/browse/OFBIZ-6197
>             Project: OFBiz
>          Issue Type: New Feature
>          Components: manufacturing
>    Affects Versions: Trunk
>            Reporter: Christian Carlow
>            Assignee: Pierre Smits
>         Attachments: OFBIZ-6197.patch
>
>
> Manufacturing Shipment Plan requires a shipment to be created before a production run can be generated to fulfill the corresponding OrderItemShipGroupAssoc.  I propose adding the capability to generate production runs based on OrderItemShipGroupAssoc without having to create a shipment for it first.  It seems unnecesarily cumbersome and redundant to require users to create a shipment and plan each order items corresponding the OrderItemShipGroupAssoc they already created.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)