https://issues.apache.org/jira/browse/OFBIZ-10388?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Jacques Le Roux closed OFBIZ-10388.
-----------------------------------
Resolution: Not A Problem
> Production Run is not created after MRP run.
> --------------------------------------------
>
> Key: OFBIZ-10388
> URL:
https://issues.apache.org/jira/browse/OFBIZ-10388> Project: OFBiz
> Issue Type: Bug
> Components: manufacturing
> Affects Versions: 16.11.04
> Environment: OS: Windows Server 2008 R2
> Database: MySQL 5.7
> JDK: 1.8.0_131
> Reporter: Schumann Ye
> Priority: Major
> Attachments: mrp_result.PNG
>
>
> I have done the following:
> 1. I created a finished goods (with BOM) with 3 raw materials.
> 2. Routings tasks & routings and product linkage are all done correctly;
> 3. When the requirement method id of the product is set to "When QOH reaches minimum stock for Product-Facility" and minimum stock of the product facility is maintained with a certain figure, after MRP is run, I have got the expected Production Run.
> Here below is where I don't understand:
> 4. After successfully creating a sales order with the product requirement (30 pcs), I can see the total ATP becomes negative figure (e.g. -30) because I don't have enough stock to cover the needed quantity required by the created sales order.
> 5. Then I go to Manufacturing to check MRP running result, it shows me only the proposed manufacturing order receipt with 5 pcs (as set in the minimum stock) as shown in the attached png file.
> 6. My question is, where is the expected 30 pcs with the expected production run?
> P.S.: I have also tried every single sort of requirement method id in the Catalog-Product-Inventory but it simply did not work as expected.
> Pls help.
--