[jira] [Comment Edited] (OFBIZ-6085) Add support for production run inventory tracking

Previous Topic Next Topic
 
classic Classic list List threaded Threaded
1 message Options
Reply | Threaded
Open this post in threaded view
|

[jira] [Comment Edited] (OFBIZ-6085) Add support for production run inventory tracking

Nicolas Malin (Jira)

    [ https://issues.apache.org/jira/browse/OFBIZ-6085?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14390794#comment-14390794 ]

Pierre Smits edited comment on OFBIZ-6085 at 4/1/15 3:31 PM:
-------------------------------------------------------------

Christian,

If you want to have inventory registrations between the various production stages, it is better to spit up the production run. WIP as defined in OFBiz (and in many other ERPs) is a cost reporting and valuation mechanism at the end of a period, that will be reverted immediately thereafter for the new period. It is not an inventory registration mechanism.


was (Author: pfm.smits):
Christian,

If you want to have inventory registrations between the various production stages, it is better to spit up the production run. WIP as defined in OFBiz (and in many other ERPs) is a cost reporting mechanism at the end of a period, that will be reverted immediately thereafter for the new period. It is not an inventory registration mechanism.

> Add support for production run inventory tracking
> -------------------------------------------------
>
>                 Key: OFBIZ-6085
>                 URL: https://issues.apache.org/jira/browse/OFBIZ-6085
>             Project: OFBiz
>          Issue Type: Improvement
>          Components: manufacturing
>    Affects Versions: Trunk
>            Reporter: Christian Carlow
>            Assignee: Pierre Smits
>
> Production run inventory tracking seems worthy of support so that production managers can get an idea of the department work load.  InventoryItemDetails should be created during production run declarations so that the material that was stocked out for the production run can be tracked while it is being manufacturing into the good.  Essentially is would be like stock moves or inventory xfers occuring within the production runs for the task fixed asset facilities/locations.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)