[jira] [Comment Edited] (OFBIZ-7454) [OFBIZ-7173] Any new product added against given routing task via Actual Material screen is not reflected on production run declaration screen.

Previous Topic Next Topic
 
classic Classic list List threaded Threaded
1 message Options
Reply | Threaded
Open this post in threaded view
|

[jira] [Comment Edited] (OFBIZ-7454) [OFBIZ-7173] Any new product added against given routing task via Actual Material screen is not reflected on production run declaration screen.

Nicolas Malin (Jira)

    [ https://issues.apache.org/jira/browse/OFBIZ-7454?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15337852#comment-15337852 ]

Anuj Jain edited comment on OFBIZ-7454 at 6/18/16 1:20 PM:
-----------------------------------------------------------

Hi,
I have provided patch for this on parent task OFBIZ-7173


was (Author: anuj.jain):
Thanks Swapnil for reporting this,

Previously, when a new component product added to a task, only InventoryItemDetail is created for such product and no WEGS is created for this component product, that's why it is not getting reflected on Production Run Declaration screen. I have added a patch which will create a new record for WEGS if no existing record for WEGS for this component found.

> [OFBIZ-7173] Any new product added against given routing task via Actual Material screen is not reflected on production run declaration screen.
> -----------------------------------------------------------------------------------------------------------------------------------------------
>
>                 Key: OFBIZ-7454
>                 URL: https://issues.apache.org/jira/browse/OFBIZ-7454
>             Project: OFBiz
>          Issue Type: Sub-task
>          Components: manufacturing
>    Affects Versions: Trunk
>            Reporter: Anuj Jain
>            Assignee: Divesh Dutta
>
> Currently, any new product added against given routing task via Actual Material screen just reflects the inventory statistics it.
> We could try to add the feature of having the added products actually be added in conjunction with Actual projected Material requirement based on original BoM associated with the routing.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)