[jira] [Commented] (OFBIZ-6085) Add support for production run inventory tracking

Previous Topic Next Topic
 
classic Classic list List threaded Threaded
1 message Options
Reply | Threaded
Open this post in threaded view
|

[jira] [Commented] (OFBIZ-6085) Add support for production run inventory tracking

Nicolas Malin (Jira)

    [ https://issues.apache.org/jira/browse/OFBIZ-6085?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14505114#comment-14505114 ]

Pierre Smits commented on OFBIZ-6085:
-------------------------------------

Re: triggered InventoryTransfer - Automatic?

Have you taken into consideration that such requires approval? Consider the scenario where the two departments are located miles apart (different facilities - or even sub facilities on the same plot). Consider also the manager of department A not being the manager of department B.

Re: User experience and optionality
The best way to maximise the user experience regarding the optionality is through configuration. But like I said: are we (OFBiz) sure we want  such aspects like time registration forms and others pulled from other components into Manufacturing, risking the potential dilution/degradation of the user experience/adoption potential? You can guess my viewpoint.

> Add support for production run inventory tracking
> -------------------------------------------------
>
>                 Key: OFBIZ-6085
>                 URL: https://issues.apache.org/jira/browse/OFBIZ-6085
>             Project: OFBiz
>          Issue Type: Improvement
>          Components: manufacturing
>    Affects Versions: Trunk
>            Reporter: Christian Carlow
>            Assignee: Pierre Smits
>         Attachments: OFBIZ-6085.patch
>
>
> Production run inventory tracking seems worthy of support so that production managers can get an idea of the department work load.  InventoryItemDetails should be created during production run declarations so that the material that was stocked out for the production run can be tracked while it is being manufacturing into the good.  Essentially is would be like stock moves or inventory xfers occuring within the production runs for the task fixed asset facilities/locations.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)