[jira] [Commented] (OFBIZ-6378) assetmaint/control/calendar show events by WorkEffortFixedAssetAssign.fromDate and thruDate

Previous Topic Next Topic
 
classic Classic list List threaded Threaded
1 message Options
Reply | Threaded
Open this post in threaded view
|

[jira] [Commented] (OFBIZ-6378) assetmaint/control/calendar show events by WorkEffortFixedAssetAssign.fromDate and thruDate

Nicolas Malin (Jira)

    [ https://issues.apache.org/jira/browse/OFBIZ-6378?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14546319#comment-14546319 ]

Christian Carlow commented on OFBIZ-6378:
-----------------------------------------

Hey Adrian,

This issue pertained to only fixed assets, not party assignments, but I suppose the same logic applies (show when event occurs not when fixed asset was assigned).  This issue arose from the need to view the schedule of production run task work to be performed with multiple parties and fixed assets at different times.  My assumption is that WorkEffortPartyAssign and WorkEffortFixedAssetAssign.fromDate and thruDate are used to schedule entities so they should appear on the calendar.

> assetmaint/control/calendar show events by WorkEffortFixedAssetAssign.fromDate and thruDate
> -------------------------------------------------------------------------------------------
>
>                 Key: OFBIZ-6378
>                 URL: https://issues.apache.org/jira/browse/OFBIZ-6378
>             Project: OFBiz
>          Issue Type: Improvement
>          Components: accounting
>    Affects Versions: Trunk
>            Reporter: Christian Carlow
>
> Fixed Asset calendar should support displaying events by assignments date range.  Currently WorkEffort.estimatedStartDate and estimatedCompletionDate are used but WorkEffortFixedAssetAssign.fromDate and thruDate are the fields that control the visibility of the event based on its date range being active.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)