[jira] [Commented] (OFBIZ-7173) The Product Added from 'Actual Material' screen could be consumed for producing end product during routing task execution

Previous Topic Next Topic
 
classic Classic list List threaded Threaded
1 message Options
Reply | Threaded
Open this post in threaded view
|

[jira] [Commented] (OFBIZ-7173) The Product Added from 'Actual Material' screen could be consumed for producing end product during routing task execution

Nicolas Malin (Jira)

    [ https://issues.apache.org/jira/browse/OFBIZ-7173?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15315981#comment-15315981 ]

Swapnil Shah commented on OFBIZ-7173:
-------------------------------------

By Inventory stats we meant that the intent of Actual Material screen is limited to show the inventory item level details for product directly issue against any task.

Possibly, we can try to make it work in sync with Production Declaration screen by giving newly added products the very same treatment as that of BoM component as specified in tix description

> The Product Added from 'Actual Material' screen could be consumed for producing end product during routing task execution
> --------------------------------------------------------------------------------------------------------------------------
>
>                 Key: OFBIZ-7173
>                 URL: https://issues.apache.org/jira/browse/OFBIZ-7173
>             Project: OFBiz
>          Issue Type: New Feature
>          Components: manufacturing
>    Affects Versions: 14.12.01, 15.12.01
>            Reporter: Swapnil Shah
>            Assignee: Divesh Dutta
>         Attachments: AM.png
>
>
> Currently any new product added against given routing task via Actual Material screen just reflects the inventory statistics it.
> We could try to add the feature of having the added products actually be added in conjunction with Actual projected Material requirement based on original BoM associated with the routing.
> # This could be done by creating fresh WorkEffortGoodStandard (WEGS) with such added products against specified routing.
> # We can begin with simple constraint of allowing new material against the only those routing task that has not completed/cancelled yet within a production run
> # Start showing such newly added material requirement in conjunction with original requirement (based on BoM) under all relevant sections over Production Declaration Screen
> Please refer to attached screenshot for reference



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)