[
https://issues.apache.org/jira/browse/OFBIZ-7173?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15339334#comment-15339334 ]
Anuj Jain commented on OFBIZ-7173:
----------------------------------
Hi,
The isssues which should/will be covered in OFBIZ-7468
#1 For newly added product in the task when task is in start/running status, The WEIA is created with WEGS for the item. The inventory should not be issue(WEIA) till the user issue any component manually from the production run screen.
#2 When any product is added in the task when task in completed status, the WEIA and WEGS both is created at that time. and WEGS should be created WEGS_COMPLETED status.
#3 User should not allow to add any component to a task when production run is in cancel status.
> The Product Added from 'Actual Material' screen could be consumed for producing end product during routing task execution
> --------------------------------------------------------------------------------------------------------------------------
>
> Key: OFBIZ-7173
> URL:
https://issues.apache.org/jira/browse/OFBIZ-7173> Project: OFBiz
> Issue Type: New Feature
> Components: manufacturing
> Reporter: Swapnil Shah
> Assignee: Swapnil Shah
> Fix For: Upcoming Branch
>
> Attachments: AM.png, OFBIZ-7173.patch, OFBIZ-7173.png
>
>
> Currently any new product added against given routing task via Actual Material screen just reflects the inventory statistics it.
> We could try to add the feature of having the added products actually be added in conjunction with Actual projected Material requirement based on original BoM associated with the routing.
> # This could be done by creating fresh WorkEffortGoodStandard (WEGS) with such added products against specified routing.
> # We can begin with simple constraint of allowing new material against the only those routing task that has not cancelled yet within a production run
> # Any completed taks should have WEGS created in COMPLETED status and WEIA created as well by issuing the added item's qty.
> # Start showing such newly added material requirement in conjunction with original requirement (based on BoM) under all relevant sections over Production Declaration Screen
> Please refer to attached screenshot for reference
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)