[jira] [Commented] (OFBIZ-7335) Production run party assignment's thruDate should be editable

Previous Topic Next Topic
 
classic Classic list List threaded Threaded
1 message Options
Reply | Threaded
Open this post in threaded view
|

[jira] [Commented] (OFBIZ-7335) Production run party assignment's thruDate should be editable

Nicolas Malin (Jira)

    [ https://issues.apache.org/jira/browse/OFBIZ-7335?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15327682#comment-15327682 ]

Pierre Smits commented on OFBIZ-7335:
-------------------------------------

Party assignments can also come from schema's (for production run assignment) or from schema tasks (for a task assignment). In those cases the assignment takes place at the moment of the creation of the production run. Thus the fromDate is known, and can be the same as the estimatedStartDate. There are related issues.



> Production run party assignment's thruDate should be editable
> -------------------------------------------------------------
>
>                 Key: OFBIZ-7335
>                 URL: https://issues.apache.org/jira/browse/OFBIZ-7335
>             Project: OFBiz
>          Issue Type: Improvement
>          Components: manufacturing
>    Affects Versions: Trunk
>            Reporter: Amardeep Singh Jhajj
>            Assignee: Amardeep Singh Jhajj
>         Attachments: OFBIZ-7335.patch
>
>
> Currently, we don't have support to set thruDate for production run party assignment. So, there should be a support of setting the thruDate if needed.



--
This message was sent by Atlassian JIRA