[jira] [Commented] (OFBIZ-7558) Any update made for 'Qty to produce' in a newly created production run not saved

Previous Topic Next Topic
 
classic Classic list List threaded Threaded
1 message Options
Reply | Threaded
Open this post in threaded view
|

[jira] [Commented] (OFBIZ-7558) Any update made for 'Qty to produce' in a newly created production run not saved

Nicolas Malin (Jira)

    [ https://issues.apache.org/jira/browse/OFBIZ-7558?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15442700#comment-15442700 ]

Swapnil Shah commented on OFBIZ-7558:
-------------------------------------

Thanks [~anuj.jain] [~diveshdut] for your contribution. I have tested the fixes as follows and found them working as expected:
# Created a PR with 2 units as qty to produce and checked the projected component quantity
# Updated the qty to produce to 5 units and checked the project qty at component level got readjusted
# Approved/Confirmed the PR and now Qty to Produce persisted with revised Qty to produce for 5 units.

Based on above test results and i am closing the issue now.

> Any update made for 'Qty to produce' in a newly created production run not saved
> ---------------------------------------------------------------------------------
>
>                 Key: OFBIZ-7558
>                 URL: https://issues.apache.org/jira/browse/OFBIZ-7558
>             Project: OFBiz
>          Issue Type: Bug
>          Components: manufacturing
>            Reporter: Swapnil Shah
>            Assignee: Swapnil Shah
>            Priority: Critical
>             Fix For: Release Branch 14.12, Release Branch 15.12
>
>         Attachments: OFBIZ-7558.patch, PR1.png, PR2.png, PR3.png
>
>
> Whenever quantity to produce is revised for any production run (in created status) the material requirement at WEGS (per BoM) gets readjusted accordingly but the same is not saved correctly (under WorkEffort.quantityToProduce)
> Now when production run is confirmed, the quantity to produce is original quantity but all material requirements at WEGS level are projected and readjusted.
> Expected Behavior:
> Any changes made to Quantity to Produce for production run should be saved correctly
> Please refer to attached screenshot
> !https://issues.apache.org/jira/secure/attachment/12812780/PR1.png|width=800px!
> !https://issues.apache.org/jira/secure/attachment/12812779/PR2.png|width=800px!
> !https://issues.apache.org/jira/secure/attachment/12812778/PR3.png|width=800px!



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)