[jira] [Created] (OFBIZ-6378) assetmaint/control/calendar show events by WorkEffortFixedAssetAssign.fromDate and thruDate

Previous Topic Next Topic
 
classic Classic list List threaded Threaded
1 message Options
Reply | Threaded
Open this post in threaded view
|

[jira] [Created] (OFBIZ-6378) assetmaint/control/calendar show events by WorkEffortFixedAssetAssign.fromDate and thruDate

Nicolas Malin (Jira)
Christian Carlow created OFBIZ-6378:
---------------------------------------

             Summary: assetmaint/control/calendar show events by WorkEffortFixedAssetAssign.fromDate and thruDate
                 Key: OFBIZ-6378
                 URL: https://issues.apache.org/jira/browse/OFBIZ-6378
             Project: OFBiz
          Issue Type: Improvement
          Components: accounting
    Affects Versions: Trunk
            Reporter: Christian Carlow


Fixed Asset calendar should support displaying events by assignments date range.  Currently WorkEffort.estimatedStartDate and estimatedCompletionDate are used but WorkEffortFixedAssetAssign.fromDate and thruDate are the fields that control the visibility of the event based on its date range being active.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)