[jira] [Created] (OFBIZ-6934) Assigning a fixed asset to a WorkEffort record doesn't respect the thruDate of the WorkEffort

Previous Topic Next Topic
 
classic Classic list List threaded Threaded
1 message Options
Reply | Threaded
Open this post in threaded view
|

[jira] [Created] (OFBIZ-6934) Assigning a fixed asset to a WorkEffort record doesn't respect the thruDate of the WorkEffort

Nicolas Malin (Jira)
Pierre Smits created OFBIZ-6934:
-----------------------------------

             Summary: Assigning a fixed asset to a WorkEffort record doesn't respect the thruDate of the WorkEffort
                 Key: OFBIZ-6934
                 URL: https://issues.apache.org/jira/browse/OFBIZ-6934
             Project: OFBiz
          Issue Type: Bug
          Components: workeffort
    Affects Versions: Trunk
            Reporter: Pierre Smits


When a fixed asset is assigned to a workeffort record the service should set the thruDate (estimatedCompletionDate) on the assignment. However this doesn't happen.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)