Swapnil Shah created OFBIZ-7260:
-----------------------------------
Summary: Show the newly added component to Production run task (apart from BoM components) over Production Run PDF
Key: OFBIZ-7260
URL:
https://issues.apache.org/jira/browse/OFBIZ-7260 Project: OFBiz
Issue Type: New Feature
Reporter: Swapnil Shah
Assignee: Divesh Dutta
So far it seems production run PDF shows only components added via original BoM associated with the finished good (possibly based on WorkEffortGoodStandard), but not the ones that are directly added via Actual Material screen in adhoc manner
It should list all the components used to complete a production run. Please refer to attached screenshot for reference.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)