[jira] [Created] (OFBIZ-7485) Documentation: Unit Test (Use)Cases for OFBIZ-7173

Previous Topic Next Topic
 
classic Classic list List threaded Threaded
1 message Options
Reply | Threaded
Open this post in threaded view
|

[jira] [Created] (OFBIZ-7485) Documentation: Unit Test (Use)Cases for OFBIZ-7173

Nicolas Malin (Jira)
Swapnil Shah created OFBIZ-7485:
-----------------------------------

             Summary: Documentation: Unit Test (Use)Cases for OFBIZ-7173
                 Key: OFBIZ-7485
                 URL: https://issues.apache.org/jira/browse/OFBIZ-7485
             Project: OFBiz
          Issue Type: Task
          Components: manufacturing
    Affects Versions: Upcoming Branch
            Reporter: Swapnil Shah
            Assignee: Swapnil Shah


Here is the list of use cases that could be validated upon fixes made in OFBIZ-7173

* *Production Run is created/confirmed but routing task is still not started*
# As soon as new Material is added via "Actual Material" screen for any task, the WorkEffortGoodStandard (WEGS) record should be created in WEGS_CREATED Status
# The above created WEGS should be reflected over "Production Run Declaration tab" under "Materials Required By The Running Task" section along with other material requirements created out of pre-defined BoM for to be produced item.

* *Routing task for any active Production Run is already started*
# As soon as new Material is added via "Actual Material" screen for any running routing task, the WorkEffortGoodStandard (WEGS) record should be created in WEGS_CREATED Status
# The above created WEGS should be reflected over "Production Run Declaration tab" under "Materials Required By The Running Task" section along with other material requirements created out of pre-defined BoM for to be produced item.
# Once user "Issue Component(ATP)" then available ATP against above newly created material requirement (WEGS) should get issued and new WorkEffortInventoryAssign (WEIA) should be created.
## The issued qty should also be reflected over "Production Run Declaration tab" under "Return Unused Materials To Warehouse" against respective task and be allowed to returned back to warehouse.

* *Production Run is not completed yet the Routing task get Completed*
#  As soon as new Material is added via "Actual Material" screen for any running routing task, the WorkEffortGoodStandard (WEGS) record should be created in WEGS_COMPLETED Status and subsequently the added material requirement should get issued and new WorkEffortInventoryAssign (WEIA) should be created in same transaction itself.
## The issued qty should also be reflected over "Production Run Declaration tab" under "Return Unused Materials To Warehouse" against respective task and be allowed to returned back to warehouse.

* *Routing task for any active Production Run is cancelled*
# New Material shouldn't be allowed to be added via Actual Material screen for any already cancelled task with proper error message

* *Production Run is already Completed (aka all Routing task are also completed/cancelled)*
# New Material shouldn't be allowed to be added via Actual Material screen for any already cancelled task with proper error message.




--
This message was sent by Atlassian JIRA
(v6.3.4#6332)