[jira] [Created] (OFBIZ-8243) End date calculation of workefforts is wrong

Previous Topic Next Topic
 
classic Classic list List threaded Threaded
1 message Options
Reply | Threaded
Open this post in threaded view
|

[jira] [Created] (OFBIZ-8243) End date calculation of workefforts is wrong

Nicolas Malin (Jira)
Pierre Smits created OFBIZ-8243:
-----------------------------------

             Summary: End date calculation of workefforts is wrong
                 Key: OFBIZ-8243
                 URL: https://issues.apache.org/jira/browse/OFBIZ-8243
             Project: OFBiz
          Issue Type: Bug
          Components: manufacturing, workeffort
    Affects Versions: Release Branch 15.12, Trunk, Release Branch 14.12
            Reporter: Pierre Smits
            Assignee: Pierre Smits


When a new production run is generated based on a production schema with tasks, the process takes the tasks of the schema (in the designated order) and  calculate the start and end date for each task (based on the provided start date of the production run.

This process doesn't work properly as tasks with a total throughput time (setup + run time) more than 1 day leads to wrong results.



--