     [ https://issues.apache.org/jira/browse/OFBIZ-5296?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Sharan Foga updated OFBIZ-5296:
-------------------------------
    Sprint: Bug Crush Event - 21/2/2015

> AtP of products should be adjusted when production run is confirmed
> -------------------------------------------------------------------
>
>                 Key: OFBIZ-5296
>                 URL: https://issues.apache.org/jira/browse/OFBIZ-5296
>             Project: OFBiz
>          Issue Type: Improvement
>          Components: manufacturing, product
>    Affects Versions: Trunk
>            Reporter: Pierre Smits
>
> When a production run is confirmed we know what is intended to go in the production run (the components or ingredients aka the raw materials) and what is intended to go out (the finished product).
> Unlike with an order, the AtP (Availability to Promise) of the goods involved does not get adjusted.
> The result is that requirements for PO or even the PO itself get generated to late (at the moment when QoH reaches minimum stock in stead of when AtP reaches minimum stock).
> Following scenarios need to be resolved:
> 1. On confirmation of the production run (action = Confirm), the AtP of the product to be produced must increase and the AtP of materials needed must decrease.
> 2. When production is running and materials have been released to the production run, it is possible to return materials back to inventory. When doing so, the AtP of the materials must be adjusted accordingly with the same date-time and quantity as the returned materials.
> 3. When a production run has rejected end products the AtP of the end product must be adjusted with the same date-time and quantity as the declaration of the rejected product.



--