[jira] [Updated] (OFBIZ-5412) Add ability to change ship estimate for purchase orders

Previous Topic Next Topic
 
classic Classic list List threaded Threaded
1 message Options
Reply | Threaded
Open this post in threaded view
|

[jira] [Updated] (OFBIZ-5412) Add ability to change ship estimate for purchase orders

Nicolas Malin (Jira)

     [ https://issues.apache.org/jira/browse/OFBIZ-5412?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Jacopo Cappellato updated OFBIZ-5412:
-------------------------------------

    Component/s: order

> Add ability to change ship estimate for purchase orders
> -------------------------------------------------------
>
>                 Key: OFBIZ-5412
>                 URL: https://issues.apache.org/jira/browse/OFBIZ-5412
>             Project: OFBiz
>          Issue Type: New Feature
>          Components: order
>    Affects Versions: SVN trunk
>            Reporter: Christian Carlow
>            Priority: Minor
>
> OFBiz should be improved to allow the ship estimate to be changed for existing purchase orders.  The ship estimate value is able to be set during the entry phase of the order by not no form exists for changing the value once the order is created.  The shipping and handling cost will have to be recalculated if the ship estimate value changes.



--
This message was sent by Atlassian JIRA
(v6.2#6252)