Arjun updated OFBIZ-5913:
-------------------------
Issue Type: Bug (was: Task)
> Regarding production run
> ------------------------
>
> Key: OFBIZ-5913
> URL:
https://issues.apache.org/jira/browse/OFBIZ-5913> Project: OFBiz
> Issue Type: Bug
> Components: manufacturing
> Affects Versions: 12.04.05
> Reporter: Arjun
>
> Following steps i have done and i got the wrong result.
> 1. I created a finished good with four raw materials.
> 2. And then i created a BOM for those. Filled fields like sequence No,Quantity and routing task.
> 3.I have created a routing and i have associated all the routing task and also product routing link as finished good.
> 4.Ran MRP and it created requirement finished good as a internal requirement. and raw materials as product requirement.
> 5. then i approved everything and i received raw materials in inventory.
> 6. i opened jobshop system created production for me from approved internal requirement.
> Here the problem for me.
> Only induced production run working correctly.
> 1. if i create production run for the same product and same routing it is assigning DEFAULT ROUTING TASK.
> QUESTIONS ??
> 1. Why it is taking default routing task will it satisfy my business requirement ??
> 2. if i am doing some thing wrong while i am creating BOM or routing. System should stop there itself and system should guide me in right way to do it. But you are programmed like if i am wrong at some point it will assign default routing .... is there a right way ?? i don't think so..
> Please give me a reply for this issue. Or else guide me where i was wrong.
--