[jira] [Updated] (OFBIZ-7111) Total Actual cost of production run need to be passed on to produced stock's unit cost for completed production run

Previous Topic Next Topic
 
classic Classic list List threaded Threaded
1 message Options
Reply | Threaded
Open this post in threaded view
|

[jira] [Updated] (OFBIZ-7111) Total Actual cost of production run need to be passed on to produced stock's unit cost for completed production run

Nicolas Malin (Jira)

     [ https://issues.apache.org/jira/browse/OFBIZ-7111?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Swapnil Shah updated OFBIZ-7111:
--------------------------------
    Affects Version/s: 15.12.01
                       14.12.01
                       Release Branch 14.12
                       Release Branch 15.12

> Total Actual cost of production run need to be passed on to produced stock's unit cost for completed production run
> -------------------------------------------------------------------------------------------------------------------
>
>                 Key: OFBIZ-7111
>                 URL: https://issues.apache.org/jira/browse/OFBIZ-7111
>             Project: OFBiz
>          Issue Type: New Feature
>          Components: manufacturing
>    Affects Versions: Release Branch 14.12, 14.12.01, Release Branch 15.12, 15.12.01
>            Reporter: Swapnil Shah
>            Assignee: Divesh Dutta
>         Attachments: ActualCostXfer_1.png, ActualCostXfer_2.png
>
>
> Currently as soon as item is produced into inventory once production run is completed then inventory get created with ZERO unit cost.
> We could pass on the total actual cost (Material+Labor+Resource etc.) to Produced Item's inventory item i.e. = Total Actual Cost/ Produced in Stock
> Please refer to attached screenshot for reference



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)