[jira] [Updated] (OFBIZ-7172) Introduce Material Trace-ability at Inventory Item level on Production Run Declaration and Actual Material screen

Previous Topic Next Topic
 
classic Classic list List threaded Threaded
1 message Options
Reply | Threaded
Open this post in threaded view
|

[jira] [Updated] (OFBIZ-7172) Introduce Material Trace-ability at Inventory Item level on Production Run Declaration and Actual Material screen

Nicolas Malin (Jira)

     [ https://issues.apache.org/jira/browse/OFBIZ-7172?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Swapnil Shah updated OFBIZ-7172:
--------------------------------
    Attachment: PRD_1.png
                AM_1.png

> Introduce Material Trace-ability at Inventory Item level on Production Run Declaration and Actual Material screen
> -----------------------------------------------------------------------------------------------------------------
>
>                 Key: OFBIZ-7172
>                 URL: https://issues.apache.org/jira/browse/OFBIZ-7172
>             Project: OFBiz
>          Issue Type: New Feature
>            Reporter: Swapnil Shah
>            Assignee: Divesh Dutta
>         Attachments: AM_1.png, PRD_1.png
>
>
> Currently The projected material requirement over 'Production Run Declaration" screen and "Actual Material" screen don't work in sync.
> It would help if The Inventory level details for projected material requirement based on BoM, start getting reflected over 'Actual Material' screen as well to track inventory against all required material at one place
> Similar inventory related information could be embedded over Declaration screen under "Material Required by Running Task" section by adding Inventory Item Id column that could show list of all InventoryItemIds against product on click of a button)
> Please refer to attached screenshot for further reference.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)