[
https://issues.apache.org/jira/browse/OFBIZ-7172?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Swapnil Shah updated OFBIZ-7172:
--------------------------------
Description:
Currently The projected material requirement over 'Production Run Declaration" screen and "Actual Material" screen don't work in sync.
It would help if The Inventory level details for projected material requirement based on BoM, start getting reflected over 'Actual Material' screen as well (even if its not issued) to track inventory against all required material at one place. We can add "Issued" column to know whether given inventory item is issued or not.
Similar inventory related information could be embedded over Declaration screen under "Material Required by Running Task" section by adding Inventory Item Id column that could show list of all InventoryItemIds against product (on click of a button)
Please refer to attached screenshot for further reference.
was:
Currently The projected material requirement over 'Production Run Declaration" screen and "Actual Material" screen don't work in sync.
It would help if The Inventory level details for projected material requirement based on BoM, start getting reflected over 'Actual Material' screen as well to track inventory against all required material at one place
Similar inventory related information could be embedded over Declaration screen under "Material Required by Running Task" section by adding Inventory Item Id column that could show list of all InventoryItemIds against product on click of a button)
Please refer to attached screenshot for further reference.
> Introduce Material Trace-ability at Inventory Item level on Production Run Declaration and Actual Material screen
> -----------------------------------------------------------------------------------------------------------------
>
> Key: OFBIZ-7172
> URL:
https://issues.apache.org/jira/browse/OFBIZ-7172> Project: OFBiz
> Issue Type: New Feature
> Reporter: Swapnil Shah
> Assignee: Divesh Dutta
> Attachments: AM_1.png, PRD_1.png
>
>
> Currently The projected material requirement over 'Production Run Declaration" screen and "Actual Material" screen don't work in sync.
> It would help if The Inventory level details for projected material requirement based on BoM, start getting reflected over 'Actual Material' screen as well (even if its not issued) to track inventory against all required material at one place. We can add "Issued" column to know whether given inventory item is issued or not.
> Similar inventory related information could be embedded over Declaration screen under "Material Required by Running Task" section by adding Inventory Item Id column that could show list of all InventoryItemIds against product (on click of a button)
> Please refer to attached screenshot for further reference.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)