svn commit: r1647559 - /ofbiz/trunk/applications/manufacturing/config/ManufacturingUiLabels.xml

Previous Topic Next Topic
 
classic Classic list List threaded Threaded
1 message Options
Reply | Threaded
Open this post in threaded view
|

svn commit: r1647559 - /ofbiz/trunk/applications/manufacturing/config/ManufacturingUiLabels.xml

jleroux@apache.org
Author: jleroux
Date: Tue Dec 23 11:50:12 2014
New Revision: 1647559

URL: http://svn.apache.org/r1647559
Log:
French translation for r1609184

Modified:
    ofbiz/trunk/applications/manufacturing/config/ManufacturingUiLabels.xml

Modified: ofbiz/trunk/applications/manufacturing/config/ManufacturingUiLabels.xml
URL: http://svn.apache.org/viewvc/ofbiz/trunk/applications/manufacturing/config/ManufacturingUiLabels.xml?rev=1647559&r1=1647558&r2=1647559&view=diff
==============================================================================
--- ofbiz/trunk/applications/manufacturing/config/ManufacturingUiLabels.xml (original)
+++ ofbiz/trunk/applications/manufacturing/config/ManufacturingUiLabels.xml Tue Dec 23 11:50:12 2014
@@ -1630,7 +1630,7 @@
         <value xml:lang="de">Abhängige Produktionsaufträge</value>
         <value xml:lang="en">Succeeding Production Run(s)</value>
         <value xml:lang="es">Esfuerzos de trabajo dependientes</value>
-        <value xml:lang="fr">Exécution de production dépendantes</value>
+        <value xml:lang="fr">Exécution d'ordre de fabrication/s suivant/s</value>
         <value xml:lang="it">Ordini di produzione successivi</value>
         <value xml:lang="ja">依存する生産実行</value>
         <value xml:lang="nl">Opvolgende productierun(s)</value>
@@ -2675,7 +2675,7 @@
         <value xml:lang="de">Erforderliche Produktionsaufträge</value>
         <value xml:lang="en">Preceding Production Run(s)</value>
         <value xml:lang="es">Órdenes de producción obligatorias</value>
-        <value xml:lang="fr">Cadences de production obligatoires</value>
+        <value xml:lang="fr">Exécution d'ordre de fabrication/s précédent/s</value>
         <value xml:lang="it">Cicli Produzione Precedenti</value>
         <value xml:lang="ja">生産強制実行</value>
         <value xml:lang="nl">Voorafgaande productierun(s)</value>