associate many machines to a production run task

Ricardo Chavez
Hello everybody. I have this doubt about production run tasks and machines.
Is there a way to associate more than one machine (fixed asset) to a single
production run task? That would cover the case when you have many machines
working on the same production task, which I think is quite common in any
manufacturing business (e.g. many sewing machines working to complete a
production run of 1000 T-shirts).
If this cannot be done yet, are there any plans to implement it? I can post
a JIRA feature request for this (unless, of course, you think it's not a
necessary feature and it needs not to be implemented)
Thanks in advance for your answer.
Regards,

-- Ricardo Chavez
Reply | Threaded
Open this post in threaded view
|

Re: associate many machines to a production run task

Jacopo Cappellato
Hi Ricardo,

there are no plans (that I'm aware of) of implementing this feature so
please post a Jira feature request because others could be interested in
helping you with this.

This could be implemented in different ways:

a) expanding the concept of FixedAsset groups (so that the data model will
be left mostly unchanged); you create a fixed asset of type group (e.g.
"sewing machines of room A") and this fixed asset is associated to the
task; then you link each sewing machine (other fixed assets) to the fixed
asset group

b) (more complex) add new association entities to link a task (WorkEffort)
to one or more machines (FixedAsset).

If possible I'd follow the a) path... but I don't know what your
requirements are so this is just a 1 cent opinion.

Jacopo

Ricardo Chavez wrote:

> Hello everybody. I have this doubt about production run tasks and machines.
> Is there a way to associate more than one machine (fixed asset) to a single
> production run task? That would cover the case when you have many machines
> working on the same production task, which I think is quite common in any
> manufacturing business (e.g. many sewing machines working to complete a
> production run of 1000 T-shirts).
> If this cannot be done yet, are there any plans to implement it? I can post
> a JIRA feature request for this (unless, of course, you think it's not a
> necessary feature and it needs not to be implemented)
> Thanks in advance for your answer.
> Regards,
>
> -- Ricardo Chavez
>


Reply | Threaded
Open this post in threaded view
|

Re: associate many machines to a production run task

Ricardo Chavez
Hi Jacopo

Thanks for the reply. Posting the JIRA feature request right now...

-- Ricardo Chavez

On 9/28/06, Jacopo Cappellato <[hidden email]> wrote:

>
> Hi Ricardo,
>
> there are no plans (that I'm aware of) of implementing this feature so
> please post a Jira feature request because others could be interested in
> helping you with this.
>
> This could be implemented in different ways:
>
> a) expanding the concept of FixedAsset groups (so that the data model will
> be left mostly unchanged); you create a fixed asset of type group (e.g.
> "sewing machines of room A") and this fixed asset is associated to the
> task; then you link each sewing machine (other fixed assets) to the fixed
> asset group
>
> b) (more complex) add new association entities to link a task (WorkEffort)
> to one or more machines (FixedAsset).
>
> If possible I'd follow the a) path... but I don't know what your
> requirements are so this is just a 1 cent opinion.
>
> Jacopo
>
> Ricardo Chavez wrote:
> > Hello everybody. I have this doubt about production run tasks and
> machines.
> > Is there a way to associate more than one machine (fixed asset) to a
> single
> > production run task? That would cover the case when you have many
> machines
> > working on the same production task, which I think is quite common in
> any
> > manufacturing business (e.g. many sewing machines working to complete a
> > production run of 1000 T-shirts).
> > If this cannot be done yet, are there any plans to implement it? I can
> post
> > a JIRA feature request for this (unless, of course, you think it's not a
> > necessary feature and it needs not to be implemented)
> > Thanks in advance for your answer.
> > Regards,
> >
> > -- Ricardo Chavez
> >
>
>
>
Reply | Threaded
Open this post in threaded view
|

Re: associate many machines to a production run task

Ricardo Chavez
Hello everybody
I have recently found these two entities, WorkEffortFixedAssetAssign and
WorkEffortFixedAssetStd, and was wondering if anyone had some information on
them, such as their purpose and how are they meant to be used, because they
might be what I'm looking for to implement the feature I described. So, any
thoughts?
Thanks in advance.
Regards,

-- Ricardo Chavez

On 9/29/06, Ricardo Chavez <[hidden email]> wrote:

>
> Hi Jacopo
>
> Thanks for the reply. Posting the JIRA feature request right now...
>
> -- Ricardo Chavez
>
> On 9/28/06, Jacopo Cappellato < [hidden email]> wrote:
> >
> > Hi Ricardo,
> >
> > there are no plans (that I'm aware of) of implementing this feature so
> > please post a Jira feature request because others could be interested in
> > helping you with this.
> >
> > This could be implemented in different ways:
> >
> > a) expanding the concept of FixedAsset groups (so that the data model
> > will
> > be left mostly unchanged); you create a fixed asset of type group (e.g.
> > "sewing machines of room A") and this fixed asset is associated to the
> > task; then you link each sewing machine (other fixed assets) to the
> > fixed
> > asset group
> >
> > b) (more complex) add new association entities to link a task
> > (WorkEffort)
> > to one or more machines (FixedAsset).
> >
> > If possible I'd follow the a) path... but I don't know what your
> > requirements are so this is just a 1 cent opinion.
> >
> > Jacopo
> >
> > Ricardo Chavez wrote:
> > > Hello everybody. I have this doubt about production run tasks and
> > machines.
> > > Is there a way to associate more than one machine (fixed asset) to a
> > single
> > > production run task? That would cover the case when you have many
> > machines
> > > working on the same production task, which I think is quite common in
> > any
> > > manufacturing business (e.g. many sewing machines working to complete
> > a
> > > production run of 1000 T-shirts).
> > > If this cannot be done yet, are there any plans to implement it? I can
> > post
> > > a JIRA feature request for this (unless, of course, you think it's not
> > a
> > > necessary feature and it needs not to be implemented)
> > > Thanks in advance for your answer.
> > > Regards,
> > >
> > > -- Ricardo Chavez
> > >
> >
> >
> >
>
Reply | Threaded
Open this post in threaded view
|

Re: associate many machines to a production run task

Jacopo Cappellato
Hi Ricardo,

yes you are completely right!
WorkEffortFixedAssetStd should be used to specify the standard machines
associated to a routing task.
WorkEffortFixedAssetAssign should record the actual machines assigned to
a production run task.
In general, this is the pattern we are using for this kind of things.

Jacopo


Ricardo Chavez wrote:

> Hello everybody
> I have recently found these two entities, WorkEffortFixedAssetAssign and
> WorkEffortFixedAssetStd, and was wondering if anyone had some
> information on
> them, such as their purpose and how are they meant to be used, because they
> might be what I'm looking for to implement the feature I described. So, any
> thoughts?
> Thanks in advance.
> Regards,
>
> -- Ricardo Chavez
>
> On 9/29/06, Ricardo Chavez <[hidden email]> wrote:
>>
>> Hi Jacopo
>>
>> Thanks for the reply. Posting the JIRA feature request right now...
>>
>> -- Ricardo Chavez
>>
>> On 9/28/06, Jacopo Cappellato < [hidden email]> wrote:
>> >
>> > Hi Ricardo,
>> >
>> > there are no plans (that I'm aware of) of implementing this feature so
>> > please post a Jira feature request because others could be
>> interested in
>> > helping you with this.
>> >
>> > This could be implemented in different ways:
>> >
>> > a) expanding the concept of FixedAsset groups (so that the data model
>> > will
>> > be left mostly unchanged); you create a fixed asset of type group (e.g.
>> > "sewing machines of room A") and this fixed asset is associated to the
>> > task; then you link each sewing machine (other fixed assets) to the
>> > fixed
>> > asset group
>> >
>> > b) (more complex) add new association entities to link a task
>> > (WorkEffort)
>> > to one or more machines (FixedAsset).
>> >
>> > If possible I'd follow the a) path... but I don't know what your
>> > requirements are so this is just a 1 cent opinion.
>> >
>> > Jacopo
>> >
>> > Ricardo Chavez wrote:
>> > > Hello everybody. I have this doubt about production run tasks and
>> > machines.
>> > > Is there a way to associate more than one machine (fixed asset) to a
>> > single
>> > > production run task? That would cover the case when you have many
>> > machines
>> > > working on the same production task, which I think is quite common in
>> > any
>> > > manufacturing business (e.g. many sewing machines working to complete
>> > a
>> > > production run of 1000 T-shirts).
>> > > If this cannot be done yet, are there any plans to implement it? I
>> can
>> > post
>> > > a JIRA feature request for this (unless, of course, you think it's
>> not
>> > a
>> > > necessary feature and it needs not to be implemented)
>> > > Thanks in advance for your answer.
>> > > Regards,
>> > >
>> > > -- Ricardo Chavez
>> > >
>> >
>> >
>> >
>>
>

Reply | Threaded
Open this post in threaded view
|

Re: associate many machines to a production run task

Ricardo Chavez
Hi Jacopo,

great, that's very useful information ;)
I'll give a try to implementing those screens
Thanks a lot!

-- Ricardo

On 10/4/06, Jacopo Cappellato <[hidden email]> wrote:

>
> Hi Ricardo,
>
> yes you are completely right!
> WorkEffortFixedAssetStd should be used to specify the standard machines
> associated to a routing task.
> WorkEffortFixedAssetAssign should record the actual machines assigned to
> a production run task.
> In general, this is the pattern we are using for this kind of things.
>
> Jacopo
>
>
> Ricardo Chavez wrote:
> > Hello everybody
> > I have recently found these two entities, WorkEffortFixedAssetAssign and
> > WorkEffortFixedAssetStd, and was wondering if anyone had some
> > information on
> > them, such as their purpose and how are they meant to be used, because
> they
> > might be what I'm looking for to implement the feature I described. So,
> any
> > thoughts?
> > Thanks in advance.
> > Regards,
> >
> > -- Ricardo Chavez
> >
> > On 9/29/06, Ricardo Chavez <[hidden email]> wrote:
> >>
> >> Hi Jacopo
> >>
> >> Thanks for the reply. Posting the JIRA feature request right now...
> >>
> >> -- Ricardo Chavez
> >>
> >> On 9/28/06, Jacopo Cappellato < [hidden email]> wrote:
> >> >
> >> > Hi Ricardo,
> >> >
> >> > there are no plans (that I'm aware of) of implementing this feature
> so
> >> > please post a Jira feature request because others could be
> >> interested in
> >> > helping you with this.
> >> >
> >> > This could be implemented in different ways:
> >> >
> >> > a) expanding the concept of FixedAsset groups (so that the data model
> >> > will
> >> > be left mostly unchanged); you create a fixed asset of type group (
> e.g.
> >> > "sewing machines of room A") and this fixed asset is associated to
> the
> >> > task; then you link each sewing machine (other fixed assets) to the
> >> > fixed
> >> > asset group
> >> >
> >> > b) (more complex) add new association entities to link a task
> >> > (WorkEffort)
> >> > to one or more machines (FixedAsset).
> >> >
> >> > If possible I'd follow the a) path... but I don't know what your
> >> > requirements are so this is just a 1 cent opinion.
> >> >
> >> > Jacopo
> >> >
> >> > Ricardo Chavez wrote:
> >> > > Hello everybody. I have this doubt about production run tasks and
> >> > machines.
> >> > > Is there a way to associate more than one machine (fixed asset) to
> a
> >> > single
> >> > > production run task? That would cover the case when you have many
> >> > machines
> >> > > working on the same production task, which I think is quite common
> in
> >> > any
> >> > > manufacturing business (e.g. many sewing machines working to
> complete
> >> > a
> >> > > production run of 1000 T-shirts).
> >> > > If this cannot be done yet, are there any plans to implement it? I
> >> can
> >> > post
> >> > > a JIRA feature request for this (unless, of course, you think it's
> >> not
> >> > a
> >> > > necessary feature and it needs not to be implemented)
> >> > > Thanks in advance for your answer.
> >> > > Regards,
> >> > >
> >> > > -- Ricardo Chavez
> >> > >
> >> >
> >> >
> >> >
> >>
> >
>
>
Reply | Threaded
Open this post in threaded view
|

Re: associate many machines to a production run task

Ricardo Chavez
In reply to this post by Jacopo Cappellato
Hi Jacopo,

great, that's very useful information ;)
I'll give a try to implementing those screens
Thanks a lot!

-- Ricardo

On 10/4/06, Jacopo Cappellato <[hidden email]> wrote:

>
> Hi Ricardo,
>
> yes you are completely right!
> WorkEffortFixedAssetStd should be used to specify the standard machines
> associated to a routing task.
> WorkEffortFixedAssetAssign should record the actual machines assigned to
> a production run task.
> In general, this is the pattern we are using for this kind of things.
>
> Jacopo
>
>
> Ricardo Chavez wrote:
> > Hello everybody
> > I have recently found these two entities, WorkEffortFixedAssetAssign and
> > WorkEffortFixedAssetStd, and was wondering if anyone had some
> > information on
> > them, such as their purpose and how are they meant to be used, because
> they
> > might be what I'm looking for to implement the feature I described. So,
> any
> > thoughts?
> > Thanks in advance.
> > Regards,
> >
> > -- Ricardo Chavez
> >
> > On 9/29/06, Ricardo Chavez <[hidden email]> wrote:
> >>
> >> Hi Jacopo
> >>
> >> Thanks for the reply. Posting the JIRA feature request right now...
> >>
> >> -- Ricardo Chavez
> >>
> >> On 9/28/06, Jacopo Cappellato < [hidden email]> wrote:
> >> >
> >> > Hi Ricardo,
> >> >
> >> > there are no plans (that I'm aware of) of implementing this feature
> so
> >> > please post a Jira feature request because others could be
> >> interested in
> >> > helping you with this.
> >> >
> >> > This could be implemented in different ways:
> >> >
> >> > a) expanding the concept of FixedAsset groups (so that the data model
> >> > will
> >> > be left mostly unchanged); you create a fixed asset of type group (
> e.g.
> >> > "sewing machines of room A") and this fixed asset is associated to
> the
> >> > task; then you link each sewing machine (other fixed assets) to the
> >> > fixed
> >> > asset group
> >> >
> >> > b) (more complex) add new association entities to link a task
> >> > (WorkEffort)
> >> > to one or more machines (FixedAsset).
> >> >
> >> > If possible I'd follow the a) path... but I don't know what your
> >> > requirements are so this is just a 1 cent opinion.
> >> >
> >> > Jacopo
> >> >
> >> > Ricardo Chavez wrote:
> >> > > Hello everybody. I have this doubt about production run tasks and
> >> > machines.
> >> > > Is there a way to associate more than one machine (fixed asset) to
> a
> >> > single
> >> > > production run task? That would cover the case when you have many
> >> > machines
> >> > > working on the same production task, which I think is quite common
> in
> >> > any
> >> > > manufacturing business (e.g. many sewing machines working to
> complete
> >> > a
> >> > > production run of 1000 T-shirts).
> >> > > If this cannot be done yet, are there any plans to implement it? I
> >> can
> >> > post
> >> > > a JIRA feature request for this (unless, of course, you think it's
> >> not
> >> > a
> >> > > necessary feature and it needs not to be implemented)
> >> > > Thanks in advance for your answer.
> >> > > Regards,
> >> > >
> >> > > -- Ricardo Chavez
> >> > >
> >> >
> >> >
> >> >
> >>
> >
>
>
Reply | Threaded
Open this post in threaded view
|

Re: associate many machines to a production run task

Ricardo Chavez
In reply to this post by Jacopo Cappellato
Hello everyone

I've decided to implement the corresponding screens: since the data
structures are already there, doing so should be a breeze thanks to the
framework (auto-fields-entity is sweet :)... ). However, I have some doubts
regarding the WorkEffortFixedAssetStd and WorkEffortFixedAssetAssign
entities:
- I thought both entites would have a relationship to the FixedAsset entity
(so the former would tell the fixed asset group and the latter would tell
the actual machine used), but a closer look to WorkEffortFixedAssetStd show
that it is related to FixedAssetType, so I'm obviously getting it wrong. Any
clues on why WorkEffortFixedAssetStd is related to FixedAssetType instead of
FixedAsset?
- About the estimatedDuration field in WorkEffortFixedAssetStd, which units
is it (intended to be) measured in? hours? milliseconds? user-decided time
unit?
- I see WorkEffortFixedAssetAssign has a statusId field, which (I suppose)
must be of type WorkEffort Asset (WORK_EFF_ASSET_STTS); however, I haven't
found any status of this type. Which would be those statuses?
Hope you can enlighten me on this matters, oh wise masters :)
Thanks in advance for your answers.
Regards,

-- Ricardo Chavez

On 10/4/06, Jacopo Cappellato <[hidden email]> wrote:

>
> Hi Ricardo,
>
> yes you are completely right!
> WorkEffortFixedAssetStd should be used to specify the standard machines
> associated to a routing task.
> WorkEffortFixedAssetAssign should record the actual machines assigned to
> a production run task.
> In general, this is the pattern we are using for this kind of things.
>
> Jacopo
>
>
> Ricardo Chavez wrote:
> > Hello everybody
> > I have recently found these two entities, WorkEffortFixedAssetAssign and
>
> > WorkEffortFixedAssetStd, and was wondering if anyone had some
> > information on
> > them, such as their purpose and how are they meant to be used, because
> they
> > might be what I'm looking for to implement the feature I described. So,
> any
> > thoughts?
> > Thanks in advance.
> > Regards,
> >
> > -- Ricardo Chavez
> >
> > On 9/29/06, Ricardo Chavez <[hidden email]> wrote:
> >>
> >> Hi Jacopo
> >>
> >> Thanks for the reply. Posting the JIRA feature request right now...
> >>
> >> -- Ricardo Chavez
> >>
> >> On 9/28/06, Jacopo Cappellato < [hidden email]> wrote:
> >> >
> >> > Hi Ricardo,
> >> >
> >> > there are no plans (that I'm aware of) of implementing this feature
> so
> >> > please post a Jira feature request because others could be
> >> interested in
> >> > helping you with this.
> >> >
> >> > This could be implemented in different ways:
> >> >
> >> > a) expanding the concept of FixedAsset groups (so that the data model
>
> >> > will
> >> > be left mostly unchanged); you create a fixed asset of type group (
> e.g.
> >> > "sewing machines of room A") and this fixed asset is associated to
> the
> >> > task; then you link each sewing machine (other fixed assets) to the
> >> > fixed
> >> > asset group
> >> >
> >> > b) (more complex) add new association entities to link a task
> >> > (WorkEffort)
> >> > to one or more machines (FixedAsset).
> >> >
> >> > If possible I'd follow the a) path... but I don't know what your
> >> > requirements are so this is just a 1 cent opinion.
> >> >
> >> > Jacopo
> >> >
> >> > Ricardo Chavez wrote:
> >> > > Hello everybody. I have this doubt about production run tasks and
> >> > machines.
> >> > > Is there a way to associate more than one machine (fixed asset) to
> a
> >> > single
> >> > > production run task? That would cover the case when you have many
> >> > machines
> >> > > working on the same production task, which I think is quite common
> in
> >> > any
> >> > > manufacturing business (e.g. many sewing machines working to
> complete
> >> > a
> >> > > production run of 1000 T-shirts).
> >> > > If this cannot be done yet, are there any plans to implement it? I
> >> can
> >> > post
> >> > > a JIRA feature request for this (unless, of course, you think it's
> >> not
> >> > a
> >> > > necessary feature and it needs not to be implemented)
> >> > > Thanks in advance for your answer.
> >> > > Regards,
> >> > >
> >> > > -- Ricardo Chavez
> >> > >
> >> >
> >> >
> >> >
> >>
> >
>
>