[jira] [Created] (OFBIZ-5494) The cost bearer determines the approving manager of the Expense Declaration

Previous Topic Next Topic
 
classic Classic list List threaded Threaded
1 message Options
Reply | Threaded
Open this post in threaded view
|

[jira] [Created] (OFBIZ-5494) The cost bearer determines the approving manager of the Expense Declaration

Nicolas Malin (Jira)
Pierre Smits created OFBIZ-5494:
-----------------------------------

             Summary: The cost bearer determines the approving manager of the Expense Declaration
                 Key: OFBIZ-5494
                 URL: https://issues.apache.org/jira/browse/OFBIZ-5494
             Project: OFBiz
          Issue Type: New Feature
            Reporter: Pierre Smits


When the cost bearer of the expense declaration is set, the associated approving member is set.

- In the case of a marketing event being the cost bearer, the marketing campain owner (or manager) is the approving manager
- in the case of a project or project task being the cost bearer, the project manager (or the project controller) is the approving manager
- in the case of a general or operational expense GL-account the manager of the organisational unit the employee belongs to is the approving manager



--
This message was sent by Atlassian JIRA
(v6.1.5#6160)