[jira] [Created] (OFBIZ-4396) Project Manager Gantt chart does not display correctly using any of the visual themes

Previous Topic Next Topic
 
classic Classic list List threaded Threaded
38 messages Options
12
Reply | Threaded
Open this post in threaded view
|

[jira] [Created] (OFBIZ-4396) Project Manager Gantt chart does not display correctly using any of the visual themes

Nicolas Malin (Jira)
Project Manager Gantt chart does not display correctly using any of the visual themes
-------------------------------------------------------------------------------------

                 Key: OFBIZ-4396
                 URL: https://issues.apache.org/jira/browse/OFBIZ-4396
             Project: OFBiz
          Issue Type: Bug
          Components: specialpurpose/projectmgr
    Affects Versions: Release 10.04
         Environment: RHEL 5.5
JDK 1.6
MySQL 5
            Reporter: Tolulope Aganga-Williams
            Priority: Minor


The Gannt chart displays incorrectly in every browser and using any visual theme. The chart does not align the task on the left to the progress bar on the right. The problem is bad to severe depending on which visual theme you have enabled. I have even updated to the latest JSGantt some improvement but does not fix it.

--
This message is automatically generated by JIRA.
For more information on JIRA, see: http://www.atlassian.com/software/jira

       
Reply | Threaded
Open this post in threaded view
|

[jira] [Commented] (OFBIZ-4396) Project Manager Gantt chart does not display correctly using any of the visual themes

Nicolas Malin (Jira)

    [ https://issues.apache.org/jira/browse/OFBIZ-4396?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13099751#comment-13099751 ]

BJ Freeman commented on OFBIZ-4396:
-----------------------------------

does what you see look like:
https://demo-trunk.ofbiz.apache.org:8443/projectmgr/control/ganttChart?projectId=9000



> Project Manager Gantt chart does not display correctly using any of the visual themes
> -------------------------------------------------------------------------------------
>
>                 Key: OFBIZ-4396
>                 URL: https://issues.apache.org/jira/browse/OFBIZ-4396
>             Project: OFBiz
>          Issue Type: Bug
>          Components: specialpurpose/projectmgr
>    Affects Versions: Release 10.04
>         Environment: RHEL 5.5
> JDK 1.6
> MySQL 5
>            Reporter: Tolulope Aganga-Williams
>            Priority: Minor
>              Labels: jsgantt, projectmgr
>
> The Gannt chart displays incorrectly in every browser and using any visual theme. The chart does not align the task on the left to the progress bar on the right. The problem is bad to severe depending on which visual theme you have enabled. I have even updated to the latest JSGantt some improvement but does not fix it.

--
This message is automatically generated by JIRA.
For more information on JIRA, see: http://www.atlassian.com/software/jira

       
Reply | Threaded
Open this post in threaded view
|

[jira] [Commented] (OFBIZ-4396) Project Manager Gantt chart does not display correctly using any of the visual themes

Nicolas Malin (Jira)
In reply to this post by Nicolas Malin (Jira)

    [ https://issues.apache.org/jira/browse/OFBIZ-4396?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13100353#comment-13100353 ]

Tolulope Aganga-Williams commented on OFBIZ-4396:
-------------------------------------------------

No, i'm using the latest 10.04 build. I took a screenshot
https://docs.google.com/leaf?id=0ByTpzTzHJA_tODRjMWQ4ZjYtYzI1Zi00ZjNiLTlmMDktNjQ3NDJjYTk0NWU2&hl=en_US


> Project Manager Gantt chart does not display correctly using any of the visual themes
> -------------------------------------------------------------------------------------
>
>                 Key: OFBIZ-4396
>                 URL: https://issues.apache.org/jira/browse/OFBIZ-4396
>             Project: OFBiz
>          Issue Type: Bug
>          Components: specialpurpose/projectmgr
>    Affects Versions: Release 10.04
>         Environment: RHEL 5.5
> JDK 1.6
> MySQL 5
>            Reporter: Tolulope Aganga-Williams
>            Priority: Minor
>              Labels: jsgantt, projectmgr
>
> The Gannt chart displays incorrectly in every browser and using any visual theme. The chart does not align the task on the left to the progress bar on the right. The problem is bad to severe depending on which visual theme you have enabled. I have even updated to the latest JSGantt some improvement but does not fix it.

--
This message is automatically generated by JIRA.
For more information on JIRA, see: http://www.atlassian.com/software/jira

       
Reply | Threaded
Open this post in threaded view
|

[jira] [Commented] (OFBIZ-4396) Project Manager Gantt chart does not display correctly using any of the visual themes

Nicolas Malin (Jira)
In reply to this post by Nicolas Malin (Jira)

    [ https://issues.apache.org/jira/browse/OFBIZ-4396?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13100377#comment-13100377 ]

BJ Freeman commented on OFBIZ-4396:
-----------------------------------

I suggest you either upgrade to trunk or go through the commits to see what has been added that fixed this.
I also use eclipse and view the SVN history for a component, this helps in tracking down the commit(s) that I need.

> Project Manager Gantt chart does not display correctly using any of the visual themes
> -------------------------------------------------------------------------------------
>
>                 Key: OFBIZ-4396
>                 URL: https://issues.apache.org/jira/browse/OFBIZ-4396
>             Project: OFBiz
>          Issue Type: Bug
>          Components: specialpurpose/projectmgr
>    Affects Versions: Release 10.04
>         Environment: RHEL 5.5
> JDK 1.6
> MySQL 5
>            Reporter: Tolulope Aganga-Williams
>            Priority: Minor
>              Labels: jsgantt, projectmgr
>
> The Gannt chart displays incorrectly in every browser and using any visual theme. The chart does not align the task on the left to the progress bar on the right. The problem is bad to severe depending on which visual theme you have enabled. I have even updated to the latest JSGantt some improvement but does not fix it.

--
This message is automatically generated by JIRA.
For more information on JIRA, see: http://www.atlassian.com/software/jira

       
Reply | Threaded
Open this post in threaded view
|

[jira] [Commented] (OFBIZ-4396) Project Manager Gantt chart does not display correctly using any of the visual themes

Nicolas Malin (Jira)
In reply to this post by Nicolas Malin (Jira)

    [ https://issues.apache.org/jira/browse/OFBIZ-4396?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13100585#comment-13100585 ]

Tolulope Aganga-Williams commented on OFBIZ-4396:
-------------------------------------------------

I updated to trunk the issue still exists. I seems that once you add more phases/tasks the display breaks.

thanks

> Project Manager Gantt chart does not display correctly using any of the visual themes
> -------------------------------------------------------------------------------------
>
>                 Key: OFBIZ-4396
>                 URL: https://issues.apache.org/jira/browse/OFBIZ-4396
>             Project: OFBiz
>          Issue Type: Bug
>          Components: specialpurpose/projectmgr
>    Affects Versions: Release 10.04
>         Environment: RHEL 5.5
> JDK 1.6
> MySQL 5
>            Reporter: Tolulope Aganga-Williams
>            Priority: Minor
>              Labels: jsgantt, projectmgr
>
> The Gannt chart displays incorrectly in every browser and using any visual theme. The chart does not align the task on the left to the progress bar on the right. The problem is bad to severe depending on which visual theme you have enabled. I have even updated to the latest JSGantt some improvement but does not fix it.

--
This message is automatically generated by JIRA.
For more information on JIRA, see: http://www.atlassian.com/software/jira

       
Reply | Threaded
Open this post in threaded view
|

[jira] [Issue Comment Edited] (OFBIZ-4396) Project Manager Gantt chart does not display correctly using any of the visual themes

Nicolas Malin (Jira)
In reply to this post by Nicolas Malin (Jira)

    [ https://issues.apache.org/jira/browse/OFBIZ-4396?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13100585#comment-13100585 ]

Tolulope Aganga-Williams edited comment on OFBIZ-4396 at 9/8/11 7:11 PM:
-------------------------------------------------------------------------

I updated my installation to trunk (fresh folder) the issue still exists. It seems that once you add more phases/tasks the display breaks.

thanks

      was (Author: [hidden email]):
    I updated to trunk the issue still exists. I seems that once you add more phases/tasks the display breaks.

thanks
 

> Project Manager Gantt chart does not display correctly using any of the visual themes
> -------------------------------------------------------------------------------------
>
>                 Key: OFBIZ-4396
>                 URL: https://issues.apache.org/jira/browse/OFBIZ-4396
>             Project: OFBiz
>          Issue Type: Bug
>          Components: specialpurpose/projectmgr
>    Affects Versions: Release 10.04
>         Environment: RHEL 5.5
> JDK 1.6
> MySQL 5
>            Reporter: Tolulope Aganga-Williams
>            Priority: Minor
>              Labels: jsgantt, projectmgr
>
> The Gannt chart displays incorrectly in every browser and using any visual theme. The chart does not align the task on the left to the progress bar on the right. The problem is bad to severe depending on which visual theme you have enabled. I have even updated to the latest JSGantt some improvement but does not fix it.

--
This message is automatically generated by JIRA.
For more information on JIRA, see: http://www.atlassian.com/software/jira

       
Reply | Threaded
Open this post in threaded view
|

[jira] [Issue Comment Edited] (OFBIZ-4396) Project Manager Gantt chart does not display correctly using any of the visual themes

Nicolas Malin (Jira)
In reply to this post by Nicolas Malin (Jira)

    [ https://issues.apache.org/jira/browse/OFBIZ-4396?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13100585#comment-13100585 ]

Tolulope Aganga-Williams edited comment on OFBIZ-4396 at 9/8/11 7:14 PM:
-------------------------------------------------------------------------

I updated my installation to trunk (fresh folder) the issue still exists. It seems that once you add more phases/tasks the display breaks.

BJ i added some more phases/tasks to the demo site you can see the shift happening on the gannt chart. Thoughts?

thanks

      was (Author: [hidden email]):
    I updated my installation to trunk (fresh folder) the issue still exists. It seems that once you add more phases/tasks the display breaks.

thanks
 

> Project Manager Gantt chart does not display correctly using any of the visual themes
> -------------------------------------------------------------------------------------
>
>                 Key: OFBIZ-4396
>                 URL: https://issues.apache.org/jira/browse/OFBIZ-4396
>             Project: OFBiz
>          Issue Type: Bug
>          Components: specialpurpose/projectmgr
>    Affects Versions: Release 10.04
>         Environment: RHEL 5.5
> JDK 1.6
> MySQL 5
>            Reporter: Tolulope Aganga-Williams
>            Priority: Minor
>              Labels: jsgantt, projectmgr
>
> The Gannt chart displays incorrectly in every browser and using any visual theme. The chart does not align the task on the left to the progress bar on the right. The problem is bad to severe depending on which visual theme you have enabled. I have even updated to the latest JSGantt some improvement but does not fix it.

--
This message is automatically generated by JIRA.
For more information on JIRA, see: http://www.atlassian.com/software/jira

       
Reply | Threaded
Open this post in threaded view
|

[jira] [Commented] (OFBIZ-4396) Project Manager Gantt chart does not display correctly using any of the visual themes

Nicolas Malin (Jira)
In reply to this post by Nicolas Malin (Jira)

    [ https://issues.apache.org/jira/browse/OFBIZ-4396?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13100630#comment-13100630 ]

BJ Freeman commented on OFBIZ-4396:
-----------------------------------

component://projectmgr/webapp/projectmgr/project/gantChart.ftl
<div style="position:relative" class="gantt" id="GanttChartDIV"></div>
is where I would start.
Look in the CSS file to see what is being used.

> Project Manager Gantt chart does not display correctly using any of the visual themes
> -------------------------------------------------------------------------------------
>
>                 Key: OFBIZ-4396
>                 URL: https://issues.apache.org/jira/browse/OFBIZ-4396
>             Project: OFBiz
>          Issue Type: Bug
>          Components: specialpurpose/projectmgr
>    Affects Versions: Release 10.04
>         Environment: RHEL 5.5
> JDK 1.6
> MySQL 5
>            Reporter: Tolulope Aganga-Williams
>            Priority: Minor
>              Labels: jsgantt, projectmgr
>
> The Gannt chart displays incorrectly in every browser and using any visual theme. The chart does not align the task on the left to the progress bar on the right. The problem is bad to severe depending on which visual theme you have enabled. I have even updated to the latest JSGantt some improvement but does not fix it.

--
This message is automatically generated by JIRA.
For more information on JIRA, see: http://www.atlassian.com/software/jira

       
Reply | Threaded
Open this post in threaded view
|

[jira] [Commented] (OFBIZ-4396) Project Manager Gantt chart does not display correctly using any of the visual themes

Nicolas Malin (Jira)
In reply to this post by Nicolas Malin (Jira)

    [ https://issues.apache.org/jira/browse/OFBIZ-4396?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13100660#comment-13100660 ]

Tolulope Aganga-Williams commented on OFBIZ-4396:
-------------------------------------------------

I played around with that but couldn't fix the issue. It seems similar to

http://code.google.com/p/jsgantt/issues/detail?id=54

But i made the changes and tried his patched js file with no improvement.

> Project Manager Gantt chart does not display correctly using any of the visual themes
> -------------------------------------------------------------------------------------
>
>                 Key: OFBIZ-4396
>                 URL: https://issues.apache.org/jira/browse/OFBIZ-4396
>             Project: OFBiz
>          Issue Type: Bug
>          Components: specialpurpose/projectmgr
>    Affects Versions: Release 10.04
>         Environment: RHEL 5.5
> JDK 1.6
> MySQL 5
>            Reporter: Tolulope Aganga-Williams
>            Priority: Minor
>              Labels: jsgantt, projectmgr
>
> The Gannt chart displays incorrectly in every browser and using any visual theme. The chart does not align the task on the left to the progress bar on the right. The problem is bad to severe depending on which visual theme you have enabled. I have even updated to the latest JSGantt some improvement but does not fix it.

--
This message is automatically generated by JIRA.
For more information on JIRA, see: http://www.atlassian.com/software/jira

       
Reply | Threaded
Open this post in threaded view
|

[jira] [Commented] (OFBIZ-4396) Project Manager Gantt chart does not display correctly using any of the visual themes

Nicolas Malin (Jira)
In reply to this post by Nicolas Malin (Jira)

    [ https://issues.apache.org/jira/browse/OFBIZ-4396?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13100760#comment-13100760 ]

BJ Freeman commented on OFBIZ-4396:
-----------------------------------

I use
http://sourceforge.net/projects/openproj/
so i will not be much more help.

> Project Manager Gantt chart does not display correctly using any of the visual themes
> -------------------------------------------------------------------------------------
>
>                 Key: OFBIZ-4396
>                 URL: https://issues.apache.org/jira/browse/OFBIZ-4396
>             Project: OFBiz
>          Issue Type: Bug
>          Components: specialpurpose/projectmgr
>    Affects Versions: Release 10.04
>         Environment: RHEL 5.5
> JDK 1.6
> MySQL 5
>            Reporter: Tolulope Aganga-Williams
>            Priority: Minor
>              Labels: jsgantt, projectmgr
>
> The Gannt chart displays incorrectly in every browser and using any visual theme. The chart does not align the task on the left to the progress bar on the right. The problem is bad to severe depending on which visual theme you have enabled. I have even updated to the latest JSGantt some improvement but does not fix it.

--
This message is automatically generated by JIRA.
For more information on JIRA, see: http://www.atlassian.com/software/jira

       
Reply | Threaded
Open this post in threaded view
|

[jira] [Commented] (OFBIZ-4396) Project Manager Gantt chart does not display correctly using any of the visual themes

Nicolas Malin (Jira)
In reply to this post by Nicolas Malin (Jira)

    [ https://issues.apache.org/jira/browse/OFBIZ-4396?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13100796#comment-13100796 ]

Tolu Williams commented on OFBIZ-4396:
--------------------------------------

Maybe someone else will pick it up. I think this module has legs the
bugs should be fixed

I already have ms project but it would be nice to have an integrated
system. Isn't that the point?

Sent from my iPhone




> Project Manager Gantt chart does not display correctly using any of the visual themes
> -------------------------------------------------------------------------------------
>
>                 Key: OFBIZ-4396
>                 URL: https://issues.apache.org/jira/browse/OFBIZ-4396
>             Project: OFBiz
>          Issue Type: Bug
>          Components: specialpurpose/projectmgr
>    Affects Versions: Release 10.04
>         Environment: RHEL 5.5
> JDK 1.6
> MySQL 5
>            Reporter: Tolulope Aganga-Williams
>            Priority: Minor
>              Labels: jsgantt, projectmgr
>
> The Gannt chart displays incorrectly in every browser and using any visual theme. The chart does not align the task on the left to the progress bar on the right. The problem is bad to severe depending on which visual theme you have enabled. I have even updated to the latest JSGantt some improvement but does not fix it.

--
This message is automatically generated by JIRA.
For more information on JIRA, see: http://www.atlassian.com/software/jira

       
Reply | Threaded
Open this post in threaded view
|

[jira] [Commented] (OFBIZ-4396) Project Manager Gantt chart does not display correctly using any of the visual themes

Nicolas Malin (Jira)
In reply to this post by Nicolas Malin (Jira)

    [ https://issues.apache.org/jira/browse/OFBIZ-4396?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13100887#comment-13100887 ]

BJ Freeman commented on OFBIZ-4396:
-----------------------------------

Yes, and I integrated it in my version that is based on ofbiz Architecture and modeling.
Most of my UI is SWT. And like the GNATT.JS used a ftl to pass data to the JS I use widgets to pass data to the SWT client.


> Project Manager Gantt chart does not display correctly using any of the visual themes
> -------------------------------------------------------------------------------------
>
>                 Key: OFBIZ-4396
>                 URL: https://issues.apache.org/jira/browse/OFBIZ-4396
>             Project: OFBiz
>          Issue Type: Bug
>          Components: specialpurpose/projectmgr
>    Affects Versions: Release 10.04
>         Environment: RHEL 5.5
> JDK 1.6
> MySQL 5
>            Reporter: Tolulope Aganga-Williams
>            Priority: Minor
>              Labels: jsgantt, projectmgr
>
> The Gannt chart displays incorrectly in every browser and using any visual theme. The chart does not align the task on the left to the progress bar on the right. The problem is bad to severe depending on which visual theme you have enabled. I have even updated to the latest JSGantt some improvement but does not fix it.

--
This message is automatically generated by JIRA.
For more information on JIRA, see: http://www.atlassian.com/software/jira

       
Reply | Threaded
Open this post in threaded view
|

[jira] [Commented] (OFBIZ-4396) Project Manager Gantt chart does not display correctly using any of the visual themes

Nicolas Malin (Jira)
In reply to this post by Nicolas Malin (Jira)

    [ https://issues.apache.org/jira/browse/OFBIZ-4396?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13107151#comment-13107151 ]

Tolulope Aganga-Williams commented on OFBIZ-4396:
-------------------------------------------------

Any one else have any ideas/suggestions? i've been tweaking the jsgantt.js file for the past week with no success.

> Project Manager Gantt chart does not display correctly using any of the visual themes
> -------------------------------------------------------------------------------------
>
>                 Key: OFBIZ-4396
>                 URL: https://issues.apache.org/jira/browse/OFBIZ-4396
>             Project: OFBiz
>          Issue Type: Bug
>          Components: specialpurpose/projectmgr
>    Affects Versions: Release 10.04
>         Environment: RHEL 5.5
> JDK 1.6
> MySQL 5
>            Reporter: Tolulope Aganga-Williams
>            Priority: Minor
>              Labels: jsgantt, projectmgr
>
> The Gannt chart displays incorrectly in every browser and using any visual theme. The chart does not align the task on the left to the progress bar on the right. The problem is bad to severe depending on which visual theme you have enabled. I have even updated to the latest JSGantt some improvement but does not fix it.

--
This message is automatically generated by JIRA.
For more information on JIRA, see: http://www.atlassian.com/software/jira

       
Reply | Threaded
Open this post in threaded view
|

[jira] [Commented] (OFBIZ-4396) Project Manager Gantt chart does not display correctly using any of the visual themes

Nicolas Malin (Jira)
In reply to this post by Nicolas Malin (Jira)

    [ https://issues.apache.org/jira/browse/OFBIZ-4396?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13107162#comment-13107162 ]

Jacques Le Roux commented on OFBIZ-4396:
----------------------------------------

I guess you also tried the last trick : <<Change gname and gdatehead (in code, not in css) to 19 instead of 20>>?
But anyway, from your report about theme, it's much certainly related to them :/

> Project Manager Gantt chart does not display correctly using any of the visual themes
> -------------------------------------------------------------------------------------
>
>                 Key: OFBIZ-4396
>                 URL: https://issues.apache.org/jira/browse/OFBIZ-4396
>             Project: OFBiz
>          Issue Type: Bug
>          Components: specialpurpose/projectmgr
>    Affects Versions: Release 10.04
>         Environment: RHEL 5.5
> JDK 1.6
> MySQL 5
>            Reporter: Tolulope Aganga-Williams
>            Priority: Minor
>              Labels: jsgantt, projectmgr
>
> The Gannt chart displays incorrectly in every browser and using any visual theme. The chart does not align the task on the left to the progress bar on the right. The problem is bad to severe depending on which visual theme you have enabled. I have even updated to the latest JSGantt some improvement but does not fix it.

--
This message is automatically generated by JIRA.
For more information on JIRA, see: http://www.atlassian.com/software/jira

       
Reply | Threaded
Open this post in threaded view
|

[jira] [Commented] (OFBIZ-4396) Project Manager Gantt chart does not display correctly using any of the visual themes

Nicolas Malin (Jira)
In reply to this post by Nicolas Malin (Jira)

    [ https://issues.apache.org/jira/browse/OFBIZ-4396?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13107170#comment-13107170 ]

Tolu Williams commented on OFBIZ-4396:
--------------------------------------

Yes I tried that. No luck.

Sent from my iPhone




> Project Manager Gantt chart does not display correctly using any of the visual themes
> -------------------------------------------------------------------------------------
>
>                 Key: OFBIZ-4396
>                 URL: https://issues.apache.org/jira/browse/OFBIZ-4396
>             Project: OFBiz
>          Issue Type: Bug
>          Components: specialpurpose/projectmgr
>    Affects Versions: Release 10.04
>         Environment: RHEL 5.5
> JDK 1.6
> MySQL 5
>            Reporter: Tolulope Aganga-Williams
>            Priority: Minor
>              Labels: jsgantt, projectmgr
>
> The Gannt chart displays incorrectly in every browser and using any visual theme. The chart does not align the task on the left to the progress bar on the right. The problem is bad to severe depending on which visual theme you have enabled. I have even updated to the latest JSGantt some improvement but does not fix it.

--
This message is automatically generated by JIRA.
For more information on JIRA, see: http://www.atlassian.com/software/jira

       
Reply | Threaded
Open this post in threaded view
|

[jira] [Commented] (OFBIZ-4396) Project Manager Gantt chart does not display correctly using any of the visual themes

Nicolas Malin (Jira)
In reply to this post by Nicolas Malin (Jira)

    [ https://issues.apache.org/jira/browse/OFBIZ-4396?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13115859#comment-13115859 ]

Tolulope Aganga-Williams commented on OFBIZ-4396:
-------------------------------------------------

Anyone else had any success with rectifying this issue?
               

> Project Manager Gantt chart does not display correctly using any of the visual themes
> -------------------------------------------------------------------------------------
>
>                 Key: OFBIZ-4396
>                 URL: https://issues.apache.org/jira/browse/OFBIZ-4396
>             Project: OFBiz
>          Issue Type: Bug
>          Components: specialpurpose/projectmgr
>    Affects Versions: Release 10.04
>         Environment: RHEL 5.5
> JDK 1.6
> MySQL 5
>            Reporter: Tolulope Aganga-Williams
>            Priority: Minor
>              Labels: jsgantt, projectmgr
>
> The Gannt chart displays incorrectly in every browser and using any visual theme. The chart does not align the task on the left to the progress bar on the right. The problem is bad to severe depending on which visual theme you have enabled. I have even updated to the latest JSGantt some improvement but does not fix it.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

       
Reply | Threaded
Open this post in threaded view
|

[jira] [Commented] (OFBIZ-4396) Project Manager Gantt chart does not display correctly using any of the visual themes

Nicolas Malin (Jira)
In reply to this post by Nicolas Malin (Jira)

    [ https://issues.apache.org/jira/browse/OFBIZ-4396?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13119056#comment-13119056 ]

Tolulope Aganga-Williams commented on OFBIZ-4396:
-------------------------------------------------

This should be considered a bug with OFBIZ. The gantt chart should resemble the output as seen on the jsgantt website

www.jsgantt.com

I urgently need this fixed, would like to sponsor it.
               

> Project Manager Gantt chart does not display correctly using any of the visual themes
> -------------------------------------------------------------------------------------
>
>                 Key: OFBIZ-4396
>                 URL: https://issues.apache.org/jira/browse/OFBIZ-4396
>             Project: OFBiz
>          Issue Type: Bug
>          Components: specialpurpose/projectmgr
>    Affects Versions: Release 10.04
>         Environment: RHEL 5.5
> JDK 1.6
> MySQL 5
>            Reporter: Tolulope Aganga-Williams
>            Priority: Minor
>              Labels: jsgantt, projectmgr
>
> The Gannt chart displays incorrectly in every browser and using any visual theme. The chart does not align the task on the left to the progress bar on the right. The problem is bad to severe depending on which visual theme you have enabled. I have even updated to the latest JSGantt some improvement but does not fix it.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

       
Reply | Threaded
Open this post in threaded view
|

[jira] [Commented] (OFBIZ-4396) Project Manager Gantt chart does not display correctly using any of the visual themes

Nicolas Malin (Jira)
In reply to this post by Nicolas Malin (Jira)

    [ https://issues.apache.org/jira/browse/OFBIZ-4396?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13119095#comment-13119095 ]

BJ Freeman commented on OFBIZ-4396:
-----------------------------------

Suggest you directly contact the author
http://svn.apache.org/viewvc?view=revision&revision=931925
               

> Project Manager Gantt chart does not display correctly using any of the visual themes
> -------------------------------------------------------------------------------------
>
>                 Key: OFBIZ-4396
>                 URL: https://issues.apache.org/jira/browse/OFBIZ-4396
>             Project: OFBiz
>          Issue Type: Bug
>          Components: specialpurpose/projectmgr
>    Affects Versions: Release 10.04
>         Environment: RHEL 5.5
> JDK 1.6
> MySQL 5
>            Reporter: Tolulope Aganga-Williams
>            Priority: Minor
>              Labels: jsgantt, projectmgr
>
> The Gannt chart displays incorrectly in every browser and using any visual theme. The chart does not align the task on the left to the progress bar on the right. The problem is bad to severe depending on which visual theme you have enabled. I have even updated to the latest JSGantt some improvement but does not fix it.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

       
Reply | Threaded
Open this post in threaded view
|

[jira] [Commented] (OFBIZ-4396) Project Manager Gantt chart does not display correctly using any of the visual themes

Nicolas Malin (Jira)
In reply to this post by Nicolas Malin (Jira)

    [ https://issues.apache.org/jira/browse/OFBIZ-4396?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13119210#comment-13119210 ]

Jacques Le Roux commented on OFBIZ-4396:
----------------------------------------

Unfortunately, I think it's not only related to this part of the work but also to themes...
               

> Project Manager Gantt chart does not display correctly using any of the visual themes
> -------------------------------------------------------------------------------------
>
>                 Key: OFBIZ-4396
>                 URL: https://issues.apache.org/jira/browse/OFBIZ-4396
>             Project: OFBiz
>          Issue Type: Bug
>          Components: specialpurpose/projectmgr
>    Affects Versions: Release 10.04
>         Environment: RHEL 5.5
> JDK 1.6
> MySQL 5
>            Reporter: Tolulope Aganga-Williams
>            Priority: Minor
>              Labels: jsgantt, projectmgr
>
> The Gannt chart displays incorrectly in every browser and using any visual theme. The chart does not align the task on the left to the progress bar on the right. The problem is bad to severe depending on which visual theme you have enabled. I have even updated to the latest JSGantt some improvement but does not fix it.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

       
Reply | Threaded
Open this post in threaded view
|

[jira] [Commented] (OFBIZ-4396) Project Manager Gantt chart does not display correctly using any of the visual themes

Nicolas Malin (Jira)
In reply to this post by Nicolas Malin (Jira)

    [ https://issues.apache.org/jira/browse/OFBIZ-4396?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13119338#comment-13119338 ]

Tolulope Aganga-Williams commented on OFBIZ-4396:
-------------------------------------------------

Yes, the old 10.04 basic theme seemed to handle it much better (not perfect but much closer to the one at jsgantt,) can we just make a blank page with a button to generate the graph in a separate pop up window, one that has no styles applied? I would also add to print to pdf and print to JPEG for including it in other documents.

This PROJECT MGR module is usable, just a bit of work to get this part of it correct.
               

> Project Manager Gantt chart does not display correctly using any of the visual themes
> -------------------------------------------------------------------------------------
>
>                 Key: OFBIZ-4396
>                 URL: https://issues.apache.org/jira/browse/OFBIZ-4396
>             Project: OFBiz
>          Issue Type: Bug
>          Components: specialpurpose/projectmgr
>    Affects Versions: Release 10.04
>         Environment: RHEL 5.5
> JDK 1.6
> MySQL 5
>            Reporter: Tolulope Aganga-Williams
>            Priority: Minor
>              Labels: jsgantt, projectmgr
>
> The Gannt chart displays incorrectly in every browser and using any visual theme. The chart does not align the task on the left to the progress bar on the right. The problem is bad to severe depending on which visual theme you have enabled. I have even updated to the latest JSGantt some improvement but does not fix it.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

       
12